![](/images/graphics-bg.png)
Assessment of the Implementation of Critical Pathway in Stroke Patients: A 10-Year Follow-Up Study
المؤلفون المشاركون
Oh, Min-Kyun
Jang, Yun Jeong
Park, Dahye
Kim, Hyeong Seop
Lee, Chang Han
Byun, Ha Young
Yoon, Chul Ho
Lee, Eun Shin
Shin, Heesuk
Chun, Se-Woong
Lim, Seung-Kyu
المصدر
العدد
المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-9، 9ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2020-02-27
دولة النشر
مصر
عدد الصفحات
9
التخصصات الرئيسية
الملخص EN
Background.
The complications after stroke inhibit functional recovery and worsen the prognosis of patients.
The implementation of a critical pathway (CP) can facilitate functional recovery after stroke by enabling comprehensive and systematic structured rehabilitation.
Objective.
To evaluate the effects of the implementation of CP in stroke patients for 10 years.
Methods.
The data were collected from 960 patients who were diagnosed with a stroke at the university hospital emergency room, who were transferred to the rehabilitation center after the acute phase, and who were discharged after undergoing comprehensive rehabilitation.
Based on data collected over a period of 10 years, changes in demographic and stroke characteristics, preexisting medical conditions, poststroke complications, and functional states, as well as length of stay (LOS), were evaluated before and after CP implementation.
The modified Rankin Scale (mRS) and the Korean version of the Modified Barthel Index (K-MBI) were used to evaluate functional states.
Results.
There were no significant differences in demographic and stroke characteristics before and after CP implementation.
For those with preexisting medical conditions, there was no significant difference between before and after CP implementation.
The majority of the complications were significantly decreased after the implementation of CP.
Except for hemorrhagic stroke patients, the Brunnstrom stage in the ischemic and total stroke patients after CP implementation was significantly increased in the upper and lower extremities.
The total hospitalization LOS and rehabilitation center hospitalization times were significantly reduced in ischemic and total stroke patients.
There was no statistically significant difference in the functional gain of K-MBI and the efficiency of rehabilitation between before and after CP implementation.
Conclusion.
The implementation of CP allows for better application of evidence- and guideline-based key interventions and helps to provide early, comprehensive, organized, and more specialized care to stroke patients.
Despite limited evidence, CP is still recommended as a means of promoting best practices in hospital care for stroke patients.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Jang, Yun Jeong& Park, Dahye& Kim, Hyeong Seop& Lee, Chang Han& Byun, Ha Young& Yoon, Chul Ho…[et al.]. 2020. Assessment of the Implementation of Critical Pathway in Stroke Patients: A 10-Year Follow-Up Study. BioMed Research International،Vol. 2020, no. 2020, pp.1-9.
https://search.emarefa.net/detail/BIM-1133106
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Jang, Yun Jeong…[et al.]. Assessment of the Implementation of Critical Pathway in Stroke Patients: A 10-Year Follow-Up Study. BioMed Research International No. 2020 (2020), pp.1-9.
https://search.emarefa.net/detail/BIM-1133106
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Jang, Yun Jeong& Park, Dahye& Kim, Hyeong Seop& Lee, Chang Han& Byun, Ha Young& Yoon, Chul Ho…[et al.]. Assessment of the Implementation of Critical Pathway in Stroke Patients: A 10-Year Follow-Up Study. BioMed Research International. 2020. Vol. 2020, no. 2020, pp.1-9.
https://search.emarefa.net/detail/BIM-1133106
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1133106
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)