A Multifactory Integrated Production and Distribution Scheduling Problem with Parallel Machines and Immediate Shipments Solved by Improved Whale Optimization Algorithm

المؤلفون المشاركون

Abdollahzadeh, Vahid
Nakhaikamalabadi, Isa
Hajimolana, Seyyed Mohammad
Zegordi, Seyyed Hesamoddin

المصدر

Complexity

العدد

المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-21، 21ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2018-12-02

دولة النشر

مصر

عدد الصفحات

21

التخصصات الرئيسية

الفلسفة

الملخص EN

This paper discusses the integrated scheduling of production and distribution operations in a multifactory supply chain with make-to-order production system.

For the production side of the supply chain, we considered distributed parallel-established factories with identical parallel machines available at each factory.

We assumed that the factories could produce all customers’ orders with different production rates and costs.

For the distribution side of the supply chain, we considered a limited number of homogeneous vehicles that immediately distribute the finalized orders to the customers.

Then, a mixed-integer nonlinear programming model is developed to determine the detailed scheduling of production and distribution that minimizes the total costs of the supply chain including production, distribution, and late delivery costs.

To solve the real-world scale problems, we developed a new whale optimization algorithm (WOA).

Moreover, we conducted computational experiments by generating several test problems to evaluate the proposed algorithm.

Statistical analysis showed that the proposed algorithm has better performance than traditional WOA for different scales of the problem.

Moreover, it confirms the capability of the improved whale optimization algorithm (IWOA) to solve the medium-scale instances; however, the results indicate the better performance of genetic algorithm (GA) for the large-scale instances.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Abdollahzadeh, Vahid& Nakhaikamalabadi, Isa& Hajimolana, Seyyed Mohammad& Zegordi, Seyyed Hesamoddin. 2018. A Multifactory Integrated Production and Distribution Scheduling Problem with Parallel Machines and Immediate Shipments Solved by Improved Whale Optimization Algorithm. Complexity،Vol. 2018, no. 2018, pp.1-21.
https://search.emarefa.net/detail/BIM-1134524

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Abdollahzadeh, Vahid…[et al.]. A Multifactory Integrated Production and Distribution Scheduling Problem with Parallel Machines and Immediate Shipments Solved by Improved Whale Optimization Algorithm. Complexity No. 2018 (2018), pp.1-21.
https://search.emarefa.net/detail/BIM-1134524

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Abdollahzadeh, Vahid& Nakhaikamalabadi, Isa& Hajimolana, Seyyed Mohammad& Zegordi, Seyyed Hesamoddin. A Multifactory Integrated Production and Distribution Scheduling Problem with Parallel Machines and Immediate Shipments Solved by Improved Whale Optimization Algorithm. Complexity. 2018. Vol. 2018, no. 2018, pp.1-21.
https://search.emarefa.net/detail/BIM-1134524

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1134524