Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects

المؤلفون المشاركون

Wang, Xiangyu
Liang, Ru
Sheng, Zhaohan

المصدر

Complexity

العدد

المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-14، 14ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2018-01-03

دولة النشر

مصر

عدد الصفحات

14

التخصصات الرئيسية

الفلسفة

الملخص EN

The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects.

This fact made it increasingly tough to “go alone” into a contractor.

As a consequence, joint venture contractors with diverse strengths and weaknesses cooperatively bid for bidding.

Understanding project complexity and making decision on the optimal joint venture contractor is challenging.

This paper is to study how to select joint venture contractors for undertaking large-scale infrastructure projects based on a multiattribute mathematical model.

Two different methods are developed to solve the problem.

One is based on ideal points and the other one is based on balanced ideal advantages.

Both of the two methods consider individual difference in expert judgment and contractor attributes.

A case study of Hong Kong-Zhuhai-Macao-Bridge (HZMB) project in China is used to demonstrate how to apply these two methods and their advantages.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Liang, Ru& Sheng, Zhaohan& Wang, Xiangyu. 2018. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects. Complexity،Vol. 2018, no. 2018, pp.1-14.
https://search.emarefa.net/detail/BIM-1136336

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Liang, Ru…[et al.]. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects. Complexity No. 2018 (2018), pp.1-14.
https://search.emarefa.net/detail/BIM-1136336

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Liang, Ru& Sheng, Zhaohan& Wang, Xiangyu. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects. Complexity. 2018. Vol. 2018, no. 2018, pp.1-14.
https://search.emarefa.net/detail/BIM-1136336

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1136336