A Bee Evolutionary Guiding Nondominated Sorting Genetic Algorithm II for Multiobjective Flexible Job-Shop Scheduling

المؤلفون المشاركون

Deng, Qianwang
Gong, Guiliang
Gong, Xuran
Zhang, Like
Liu, Wei
Ren, Qinghua

المصدر

Computational Intelligence and Neuroscience

العدد

المجلد 2017، العدد 2017 (31 ديسمبر/كانون الأول 2017)، ص ص. 1-20، 20ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2017-03-28

دولة النشر

مصر

عدد الصفحات

20

التخصصات الرئيسية

الأحياء

الملخص EN

Flexible job-shop scheduling problem (FJSP) is an NP-hard puzzle which inherits the job-shop scheduling problem (JSP) characteristics.

This paper presents a bee evolutionary guiding nondominated sorting genetic algorithm II (BEG-NSGA-II) for multiobjective FJSP (MO-FJSP) with the objectives to minimize the maximal completion time, the workload of the most loaded machine, and the total workload of all machines.

It adopts a two-stage optimization mechanism during the optimizing process.

In the first stage, the NSGA-II algorithm with T iteration times is first used to obtain the initial population N, in which a bee evolutionary guiding scheme is presented to exploit the solution space extensively.

In the second stage, the NSGA-II algorithm with GEN iteration times is used again to obtain the Pareto-optimal solutions.

In order to enhance the searching ability and avoid the premature convergence, an updating mechanism is employed in this stage.

More specifically, its population consists of three parts, and each of them changes with the iteration times.

What is more, numerical simulations are carried out which are based on some published benchmark instances.

Finally, the effectiveness of the proposed BEG-NSGA-II algorithm is shown by comparing the experimental results and the results of some well-known algorithms already existed.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Deng, Qianwang& Gong, Guiliang& Gong, Xuran& Zhang, Like& Liu, Wei& Ren, Qinghua. 2017. A Bee Evolutionary Guiding Nondominated Sorting Genetic Algorithm II for Multiobjective Flexible Job-Shop Scheduling. Computational Intelligence and Neuroscience،Vol. 2017, no. 2017, pp.1-20.
https://search.emarefa.net/detail/BIM-1141000

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Deng, Qianwang…[et al.]. A Bee Evolutionary Guiding Nondominated Sorting Genetic Algorithm II for Multiobjective Flexible Job-Shop Scheduling. Computational Intelligence and Neuroscience No. 2017 (2017), pp.1-20.
https://search.emarefa.net/detail/BIM-1141000

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Deng, Qianwang& Gong, Guiliang& Gong, Xuran& Zhang, Like& Liu, Wei& Ren, Qinghua. A Bee Evolutionary Guiding Nondominated Sorting Genetic Algorithm II for Multiobjective Flexible Job-Shop Scheduling. Computational Intelligence and Neuroscience. 2017. Vol. 2017, no. 2017, pp.1-20.
https://search.emarefa.net/detail/BIM-1141000

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1141000