Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM

المؤلفون المشاركون

Peško, Igor
Mučenski, Vladimir
Šešlija, Miloš
Radović, Nebojša
Vujkov, Aleksandra
Bibić, Dragana
Krklješ, Milena

المصدر

Complexity

العدد

المجلد 2017، العدد 2017 (31 ديسمبر/كانون الأول 2017)، ص ص. 1-13، 13ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2017-12-07

دولة النشر

مصر

عدد الصفحات

13

التخصصات الرئيسية

الفلسفة

الملخص EN

Offer preparation has always been a specific part of a building process which has significant impact on company business.

Due to the fact that income greatly depends on offer’s precision and the balance between planned costs, both direct and overheads, and wished profit, it is necessary to prepare a precise offer within required time and available resources which are always insufficient.

The paper presents a research of precision that can be achieved while using artificial intelligence for estimation of cost and duration in construction projects.

Both artificial neural networks (ANNs) and support vector machines (SVM) are analysed and compared.

The best SVM has shown higher precision, when estimating costs, with mean absolute percentage error (MAPE) of 7.06% compared to the most precise ANNs which has achieved precision of 25.38%.

Estimation of works duration has proved to be more difficult.

The best MAPEs were 22.77% and 26.26% for SVM and ANN, respectively.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Peško, Igor& Mučenski, Vladimir& Šešlija, Miloš& Radović, Nebojša& Vujkov, Aleksandra& Bibić, Dragana…[et al.]. 2017. Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM. Complexity،Vol. 2017, no. 2017, pp.1-13.
https://search.emarefa.net/detail/BIM-1142639

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Peško, Igor…[et al.]. Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM. Complexity No. 2017 (2017), pp.1-13.
https://search.emarefa.net/detail/BIM-1142639

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Peško, Igor& Mučenski, Vladimir& Šešlija, Miloš& Radović, Nebojša& Vujkov, Aleksandra& Bibić, Dragana…[et al.]. Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM. Complexity. 2017. Vol. 2017, no. 2017, pp.1-13.
https://search.emarefa.net/detail/BIM-1142639

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1142639