Adaptive Inventory Control Based on Fuzzy Neural Network under Uncertain Environment

المؤلفون المشاركون

Zhang, Songtao
Ge, Jianqiao

المصدر

Complexity

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-10، 10ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-07-29

دولة النشر

مصر

عدد الصفحات

10

التخصصات الرئيسية

الفلسفة

الملخص EN

In order to achieve the actual inventory effectively tracking the target inventory under uncertain environment, this paper investigates an adaptive inventory controller for the production-inventory system.

First, an uncertain production-inventory model is constructed, and then, the uncertainty of the production-inventory model is approximated by a fuzzy neural network.

Secondly, in terms of the design of adaptive control law, the adaptive inventory controller is developed.

Under the adaptive inventory controller, the actual inventory can track the target inventory in real time and the production-inventory system can be robustly stable in uncertain environment.

Finally, the results of three simulation experiments show that the proposed adaptive inventory controller can realize both the fast tracking speed and the high tracking accuracy.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Ge, Jianqiao& Zhang, Songtao. 2020. Adaptive Inventory Control Based on Fuzzy Neural Network under Uncertain Environment. Complexity،Vol. 2020, no. 2020, pp.1-10.
https://search.emarefa.net/detail/BIM-1142798

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Ge, Jianqiao& Zhang, Songtao. Adaptive Inventory Control Based on Fuzzy Neural Network under Uncertain Environment. Complexity No. 2020 (2020), pp.1-10.
https://search.emarefa.net/detail/BIM-1142798

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Ge, Jianqiao& Zhang, Songtao. Adaptive Inventory Control Based on Fuzzy Neural Network under Uncertain Environment. Complexity. 2020. Vol. 2020, no. 2020, pp.1-10.
https://search.emarefa.net/detail/BIM-1142798

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1142798