Pricing and Collection Rate for Remanufacturing Industry considering Capacity Constraint in Recycling Channels

المؤلفون المشاركون

Chen, Jihong
Xu, Lang
Shi, Jia

المصدر

Complexity

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-13، 13ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-06-11

دولة النشر

مصر

عدد الصفحات

13

التخصصات الرئيسية

الفلسفة

الملخص EN

This paper explores the decision-making and coordination mechanism of pricing and collection rate in a closed-loop supply chain with capacity constraint in recycling channels, which consists of one manufacturer and one retailer.

On the basis of game theory, the equilibriums of decisions and profits in the centralized and decentralized scenarios are obtained and compared.

Through the performance analysis of a different scenario, a higher saving production cost and lower competition intensity trigger the members to engage in remanufacturing.

Furthermore, we try to propose a two-part tariff contract through bargaining to coordinate supply chain and achieve a Pareto improvement.

The results show that when the capacity constraints in recycling channels exceed a threshold, the decisions and profit will change.

Additionally, for closed-loop supply chain, the selling price is more susceptible to the influence of capacity constraint in recycling channel than the members’ profit.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Xu, Lang& Shi, Jia& Chen, Jihong. 2020. Pricing and Collection Rate for Remanufacturing Industry considering Capacity Constraint in Recycling Channels. Complexity،Vol. 2020, no. 2020, pp.1-13.
https://search.emarefa.net/detail/BIM-1144306

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Xu, Lang…[et al.]. Pricing and Collection Rate for Remanufacturing Industry considering Capacity Constraint in Recycling Channels. Complexity No. 2020 (2020), pp.1-13.
https://search.emarefa.net/detail/BIM-1144306

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Xu, Lang& Shi, Jia& Chen, Jihong. Pricing and Collection Rate for Remanufacturing Industry considering Capacity Constraint in Recycling Channels. Complexity. 2020. Vol. 2020, no. 2020, pp.1-13.
https://search.emarefa.net/detail/BIM-1144306

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1144306