Productivity Evaluation for Long Horizontal Well Test in Deep-Water Faulted Sandstone Reservoir

المؤلفون المشاركون

Duan, Rui
Yang, Baoquan
Zhang, Yingchun
Gao, Yihua
Yuan, Zhiwang
Zhang, Xu
Yang, Li

المصدر

Geofluids

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-10، 10ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-09-22

دولة النشر

مصر

عدد الصفحات

10

التخصصات الرئيسية

الفيزياء

الملخص EN

For deep-water faulted sandstone reservoirs, the general practice is to design long horizontal wells improving well productivity.

During the project implementation stage, well tests are performed on all drilled wells to evaluate well productivity accurately.

Furthermore, multisize chokes are often utilized in a shorten test time for loosen formation, high test cost, and high well productivity.

Nevertheless, the conventional productivity evaluation approach cannot accurately evaluate the well test productivity and has difficulty in determining the underneath pattern.

As a result, the objective of this paper is to determine a productivity evaluation method for multisize chokes long horizontal well test in deep-water faulted sandstone reservoir.

This approach introduces a productivity model for long horizontal wells in faulted sandstone reservoir.

It also includes the determination of steady-state test time and the productivity evaluation method for multisize chokes.

In this paper, the EGINA Oilfield, a deep-water faulted sandstone reservoir, located in West Africa was chosen as the research target.

Based on Renard and Dupuy’s steady-state equation, the relationship between the productivity index per meter and the length of horizontal section was derived.

Consequently, this relationship is used to determine the productivity pattern for long horizontal wells with the same geological features, which can provide more accurate productivity evaluations for tested wells and forecast the well productivity for untested wells.

After implementing this approach on the EGINA Oilfield, the determined relationship is capable to accurately evaluate the test productivity for long horizontal wells in reservoirs with similar characteristics and assist in examination and treatment for horizontal wells with abnormal productivity.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Yuan, Zhiwang& Yang, Li& Zhang, Yingchun& Duan, Rui& Zhang, Xu& Gao, Yihua…[et al.]. 2020. Productivity Evaluation for Long Horizontal Well Test in Deep-Water Faulted Sandstone Reservoir. Geofluids،Vol. 2020, no. 2020, pp.1-10.
https://search.emarefa.net/detail/BIM-1165873

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Yuan, Zhiwang…[et al.]. Productivity Evaluation for Long Horizontal Well Test in Deep-Water Faulted Sandstone Reservoir. Geofluids No. 2020 (2020), pp.1-10.
https://search.emarefa.net/detail/BIM-1165873

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Yuan, Zhiwang& Yang, Li& Zhang, Yingchun& Duan, Rui& Zhang, Xu& Gao, Yihua…[et al.]. Productivity Evaluation for Long Horizontal Well Test in Deep-Water Faulted Sandstone Reservoir. Geofluids. 2020. Vol. 2020, no. 2020, pp.1-10.
https://search.emarefa.net/detail/BIM-1165873

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1165873