The Lagrangean Relaxation for the Flow Shop Scheduling Problem with Precedence Constraints, Release Dates and Delivery Times

المؤلفون المشاركون

Fabri, Marcelus
Ramalhinho, Helena
de Souza, Mauricio C.
Ravetti, Martin G.

المصدر

Journal of Advanced Transportation

العدد

المجلد 2019، العدد 2019 (31 ديسمبر/كانون الأول 2019)، ص ص. 1-10، 10ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2019-12-23

دولة النشر

مصر

عدد الصفحات

10

التخصصات الرئيسية

هندسة مدنية

الملخص EN

This work aims to present a methodology to support a company in the automotive business on scheduling the jobs on its final processes.

These processes are: (i) checking the final product and (ii) loading the dispatch trucks.

These activities are usually found in the outbound area of any manufacturing company.

The problem faced is defined as the flow shop problem with precedence constraints, release dates, and delivery times.

The major objective is to minimize the latest date a client receives its products.

We present a time-indexed integer mathematical model to compute feasible solutions for the presented problem.

Moreover, we take advantage of the Lagrangean Relaxation procedure to compute valid lower and upper bounds.

The experiments were held based on the company’s premises.

As a conclusion, the results showed that the methodology proposed was able to compute feasible solutions for all the instances tested.

Also, the Lagrangean Relaxation approach was able to calculate better bounds in a shorter computational time than the Mathematical problem for the more complicated instances.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Fabri, Marcelus& Ramalhinho, Helena& de Souza, Mauricio C.& Ravetti, Martin G.. 2019. The Lagrangean Relaxation for the Flow Shop Scheduling Problem with Precedence Constraints, Release Dates and Delivery Times. Journal of Advanced Transportation،Vol. 2019, no. 2019, pp.1-10.
https://search.emarefa.net/detail/BIM-1169750

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Fabri, Marcelus…[et al.]. The Lagrangean Relaxation for the Flow Shop Scheduling Problem with Precedence Constraints, Release Dates and Delivery Times. Journal of Advanced Transportation No. 2019 (2019), pp.1-10.
https://search.emarefa.net/detail/BIM-1169750

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Fabri, Marcelus& Ramalhinho, Helena& de Souza, Mauricio C.& Ravetti, Martin G.. The Lagrangean Relaxation for the Flow Shop Scheduling Problem with Precedence Constraints, Release Dates and Delivery Times. Journal of Advanced Transportation. 2019. Vol. 2019, no. 2019, pp.1-10.
https://search.emarefa.net/detail/BIM-1169750

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1169750