Solving Permutation Flow Shop Scheduling Problem with Sequence-Independent Setup Time

المؤلفون المشاركون

Allali, Karam
Belabid, Jabrane
Aqil, Said

المصدر

Journal of Applied Mathematics

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-11، 11ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-01-22

دولة النشر

مصر

عدد الصفحات

11

التخصصات الرئيسية

الرياضيات

الملخص EN

In this paper, we study the resolution of a permutation flow shop problem with sequence-independent setup time.

The objective is to minimize the maximum of job completion time, also called the makespan.

In this contribution, we propose three methods of resolution, a mixed-integer linear programming (MILP) model; two heuristics, the first based on Johnson’s rule and the second based on the NEH algorithm; and finally two metaheuristics, the iterative local search algorithm and the iterated greedy algorithm.

A set of test problems is simulated numerically to validate the effectiveness of our resolution approaches.

For relatively small-size problems, it has been revealed that the adapted NEH heuristic has the best performance than that of the Johnson-based heuristic.

For the relatively medium and large problems, the comparative study between the two metaheuristics based on the exploration of the neighborhood shows that the iterated greedy algorithm records the best performances.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Belabid, Jabrane& Aqil, Said& Allali, Karam. 2020. Solving Permutation Flow Shop Scheduling Problem with Sequence-Independent Setup Time. Journal of Applied Mathematics،Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1174566

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Belabid, Jabrane…[et al.]. Solving Permutation Flow Shop Scheduling Problem with Sequence-Independent Setup Time. Journal of Applied Mathematics No. 2020 (2020), pp.1-11.
https://search.emarefa.net/detail/BIM-1174566

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Belabid, Jabrane& Aqil, Said& Allali, Karam. Solving Permutation Flow Shop Scheduling Problem with Sequence-Independent Setup Time. Journal of Applied Mathematics. 2020. Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1174566

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1174566