Optimizing Production Scheduling of Steel Plate Hot Rolling for Economic Load Dispatch under Time-of-Use Electricity Pricing

المؤلفون المشاركون

Tan, Mao
Yang, Hua-li
Duan, Bin
Su, Yong-xin
He, Feng

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2017، العدد 2017 (31 ديسمبر/كانون الأول 2017)، ص ص. 1-13، 13ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2017-03-07

دولة النشر

مصر

عدد الصفحات

13

التخصصات الرئيسية

هندسة مدنية

الملخص EN

Time-of-Use (TOU) electricity pricing provides an opportunity for industrial users to cut electricity costs.

Although many methods for Economic Load Dispatch (ELD) under TOU pricing in continuous industrial processing have been proposed, there are still difficulties in batch-type processing, since power load units are not directly adjustable and nonlinearly depend on production planning and scheduling.

In this paper, for hot rolling, a typical batch-type and energy intensive process in steel industry, a production scheduling optimization model for ELD is proposed under TOU pricing, in which the objective is to minimize electricity costs while considering penalties caused by jumps between adjacent slabs.

A NSGA-II based multiobjective production scheduling algorithm is developed to obtain Pareto optimal solutions, and then TOPSIS based multicriteria decision-making is performed to recommend an optimal solution to facilitate field operation.

Experimental results and analyses show that the proposed method cuts electricity costs in production, especially in case of allowance for penalty score increase in a certain range.

Further analyses show that the proposed method has effect on peak load regulation of power grid.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Tan, Mao& Yang, Hua-li& Duan, Bin& Su, Yong-xin& He, Feng. 2017. Optimizing Production Scheduling of Steel Plate Hot Rolling for Economic Load Dispatch under Time-of-Use Electricity Pricing. Mathematical Problems in Engineering،Vol. 2017, no. 2017, pp.1-13.
https://search.emarefa.net/detail/BIM-1189412

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Tan, Mao…[et al.]. Optimizing Production Scheduling of Steel Plate Hot Rolling for Economic Load Dispatch under Time-of-Use Electricity Pricing. Mathematical Problems in Engineering No. 2017 (2017), pp.1-13.
https://search.emarefa.net/detail/BIM-1189412

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Tan, Mao& Yang, Hua-li& Duan, Bin& Su, Yong-xin& He, Feng. Optimizing Production Scheduling of Steel Plate Hot Rolling for Economic Load Dispatch under Time-of-Use Electricity Pricing. Mathematical Problems in Engineering. 2017. Vol. 2017, no. 2017, pp.1-13.
https://search.emarefa.net/detail/BIM-1189412

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1189412