![](/images/graphics-bg.png)
Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project
المؤلفون المشاركون
Huang, Min
Bi, Hua-Ling
Lu, Fu-qiang
Duan, Shupeng
المصدر
Mathematical Problems in Engineering
العدد
المجلد 2017، العدد 2017 (31 ديسمبر/كانون الأول 2017)، ص ص. 1-17، 17ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2017-09-28
دولة النشر
مصر
عدد الصفحات
17
التخصصات الرئيسية
الملخص EN
IT outsourcing is an effective way to enhance the core competitiveness for many enterprises.
But the schedule risk of IT outsourcing project may cause enormous economic loss to enterprise.
In this paper, the Distributed Decision Making (DDM) theory and the principal-agent theory are used to build a model for schedule risk management of IT outsourcing project.
In addition, a hybrid algorithm combining simulated annealing (SA) and genetic algorithm (GA) is designed, namely, simulated annealing genetic algorithm (SAGA).
The effect of the proposed model on the schedule risk management problem is analyzed in the simulation experiment.
Meanwhile, the simulation results of the three algorithms GA, SA, and SAGA show that SAGA is the most superior one to the other two algorithms in terms of stability and convergence.
Consequently, this paper provides the scientific quantitative proposal for the decision maker who needs to manage the schedule risk of IT outsourcing project.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Lu, Fu-qiang& Bi, Hua-Ling& Huang, Min& Duan, Shupeng. 2017. Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project. Mathematical Problems in Engineering،Vol. 2017, no. 2017, pp.1-17.
https://search.emarefa.net/detail/BIM-1191591
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Lu, Fu-qiang…[et al.]. Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project. Mathematical Problems in Engineering No. 2017 (2017), pp.1-17.
https://search.emarefa.net/detail/BIM-1191591
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Lu, Fu-qiang& Bi, Hua-Ling& Huang, Min& Duan, Shupeng. Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project. Mathematical Problems in Engineering. 2017. Vol. 2017, no. 2017, pp.1-17.
https://search.emarefa.net/detail/BIM-1191591
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1191591
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)