Resource Leveling Based on Backward Controlling Activity in Line of Balance
المؤلفون المشاركون
Zhang, Lihui
Tang, Yaping
Qi, Jianxun
المصدر
Mathematical Problems in Engineering
العدد
المجلد 2017، العدد 2017 (31 ديسمبر/كانون الأول 2017)، ص ص. 1-9، 9ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2017-02-21
دولة النشر
مصر
عدد الصفحات
9
التخصصات الرئيسية
الملخص EN
The line of balance method that provides continuous and uninterrupted use of resources is one of the best methods for repetitive project resource management.
This paper develops a resource leveling algorithm based on the backward controlling activity in line of balance.
The backward controlling activity is a kind of special activity, and if its duration is prolonged the project duration could be reduced.
It brings two advantages to the resource leveling: both the resource allocated on the backward activity and the project duration are reduced.
A resource leveling algorithm is presented which permits the number of crews of the backward controlling activity to be reduced until the terminal situation is reached, where the backward controlling activity does not exist or the number of crews cannot be reduced.
That adjustment enables the productivity of all activities to be consistent.
An illustrative pipeline project demonstrates the improvement in resource leveling.
And this study designed a MATLAB program to execute the design algorithm.
The proposed model could help practitioners to achieve the goals of both resource leveling and project duration reduction without increasing any resource.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Zhang, Lihui& Tang, Yaping& Qi, Jianxun. 2017. Resource Leveling Based on Backward Controlling Activity in Line of Balance. Mathematical Problems in Engineering،Vol. 2017, no. 2017, pp.1-9.
https://search.emarefa.net/detail/BIM-1191910
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Zhang, Lihui…[et al.]. Resource Leveling Based on Backward Controlling Activity in Line of Balance. Mathematical Problems in Engineering No. 2017 (2017), pp.1-9.
https://search.emarefa.net/detail/BIM-1191910
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Zhang, Lihui& Tang, Yaping& Qi, Jianxun. Resource Leveling Based on Backward Controlling Activity in Line of Balance. Mathematical Problems in Engineering. 2017. Vol. 2017, no. 2017, pp.1-9.
https://search.emarefa.net/detail/BIM-1191910
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1191910
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر