Antisynchronization of the Hyperchaotic Systems with Uncertainty and Disturbance Using the UDE-Based Control Method

المؤلفون المشاركون

Wang, Zuoxun
Wang, Guijuan
Yu, Xiaotong

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-6، 6ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-04-21

دولة النشر

مصر

عدد الصفحات

6

التخصصات الرئيسية

هندسة مدنية

الملخص EN

In this paper, we investigate the antisynchronization problem of a class of hyperchaotic systems with both model uncertainty and external disturbance.

Firstly, combining the dynamic feedback control method and the uncertainty and disturbance estimation (UDE)-based control method, we propose a new UDE-based dynamic feedback control method.

Secondly, we take the 4D hyperchaotic system as an example and realize the antisynchronization problem of such system.

Finally, the effectiveness and correctness of the proposed method is verified by numerical simulation.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Wang, Zuoxun& Yu, Xiaotong& Wang, Guijuan. 2020. Antisynchronization of the Hyperchaotic Systems with Uncertainty and Disturbance Using the UDE-Based Control Method. Mathematical Problems in Engineering،Vol. 2020, no. 2020, pp.1-6.
https://search.emarefa.net/detail/BIM-1193692

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Wang, Zuoxun…[et al.]. Antisynchronization of the Hyperchaotic Systems with Uncertainty and Disturbance Using the UDE-Based Control Method. Mathematical Problems in Engineering No. 2020 (2020), pp.1-6.
https://search.emarefa.net/detail/BIM-1193692

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Wang, Zuoxun& Yu, Xiaotong& Wang, Guijuan. Antisynchronization of the Hyperchaotic Systems with Uncertainty and Disturbance Using the UDE-Based Control Method. Mathematical Problems in Engineering. 2020. Vol. 2020, no. 2020, pp.1-6.
https://search.emarefa.net/detail/BIM-1193692

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1193692