Reactive Strategies in the Multiproject Scheduling with Multifactor Disruptions

المؤلفون المشاركون

Su, Jiafu
Wang, Weixin
Xu, Jin
Ge, Xianlong

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-11، 11ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-05-30

دولة النشر

مصر

عدد الصفحات

11

التخصصات الرئيسية

هندسة مدنية

الملخص EN

Multiproject scheduling aims at the generation of the baseline schedules, which has been studied for several years with the goal of minimizing the total cost of the project.

In this paper, we analyzed the impact of network structure disruption, activity disruption, and resource disruption on scheduling scheme, respectively; this problem is related to the disruptions in scheduling process, which leads to a deviation between actual scheduling and baseline scheduling.

The mode of the related activities is changed and the start time is reset.

Because it is a NP-hard problem and involves a large number of activities, the dual population genetic algorithm is designed to solve this problem.

From the results of case analysis, we find that single disruption on scheduling was local, when there was no resource conflict.

While multifactor disruptions have greater effect on duration and total cost, multifactor disruptions would affect each other, so it was more complicated.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Wang, Weixin& Su, Jiafu& Xu, Jin& Ge, Xianlong. 2020. Reactive Strategies in the Multiproject Scheduling with Multifactor Disruptions. Mathematical Problems in Engineering،Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1194236

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Wang, Weixin…[et al.]. Reactive Strategies in the Multiproject Scheduling with Multifactor Disruptions. Mathematical Problems in Engineering No. 2020 (2020), pp.1-11.
https://search.emarefa.net/detail/BIM-1194236

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Wang, Weixin& Su, Jiafu& Xu, Jin& Ge, Xianlong. Reactive Strategies in the Multiproject Scheduling with Multifactor Disruptions. Mathematical Problems in Engineering. 2020. Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1194236

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1194236