The Process of High-Data-Rate Mud Pulse Signal in Logging While Drilling System

المؤلفون المشاركون

Liang, Yao
Ju, Xiaodong
Li, Anzong
Li, Chuanwei
Dai, Zhiping
Ma, Li

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-11، 11ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-03-19

دولة النشر

مصر

عدد الصفحات

11

التخصصات الرئيسية

هندسة مدنية

الملخص EN

We applied a mud pulse signal to transmit the downhole measured parameters in a Logging While Drilling (LWD) system.

The high-data-rate mud pulse signal was almost completely overwhelmed by noise and difficult to be identified because of the narrow pulse width, impacts of the pump noise, and the reflected wave.

The wavelet transform’s multiresolution is suitable for signal denoising.

In this paper, during the denoising process of the wavelet transform, we used a series of evaluation parameters to select the optimal parameter combination for denoising a mud pulse signal.

We verified the feasibility of the wavelet transform denoising algorithm by analysing and processing an operational high-data-rate mud pulse signal.

The decoding algorithm was available by applying self-correlation and bit synchronization.

The application results through a field application showed that the processing algorithm was suitable for the high-data-rate mud pulse signal’s process.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Liang, Yao& Ju, Xiaodong& Li, Anzong& Li, Chuanwei& Dai, Zhiping& Ma, Li. 2020. The Process of High-Data-Rate Mud Pulse Signal in Logging While Drilling System. Mathematical Problems in Engineering،Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1194286

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Liang, Yao…[et al.]. The Process of High-Data-Rate Mud Pulse Signal in Logging While Drilling System. Mathematical Problems in Engineering No. 2020 (2020), pp.1-11.
https://search.emarefa.net/detail/BIM-1194286

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Liang, Yao& Ju, Xiaodong& Li, Anzong& Li, Chuanwei& Dai, Zhiping& Ma, Li. The Process of High-Data-Rate Mud Pulse Signal in Logging While Drilling System. Mathematical Problems in Engineering. 2020. Vol. 2020, no. 2020, pp.1-11.
https://search.emarefa.net/detail/BIM-1194286

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1194286