Multiple Precast Component Orders Acceptance and Scheduling

المؤلفون المشاركون

Jiang, Wen
Wu, Lanjun
Cao, Yunzhong

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-15، 15ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-02-29

دولة النشر

مصر

عدد الصفحات

15

التخصصات الرئيسية

هندسة مدنية

الملخص EN

Precast components manufacturer generally operates under limited production capacity and produces products of one order which may delay another.

This paper develops a precast component order acceptance and scheduling model that aims to maximize the total profit in a stochastic multiple orders environment.

In that model, the increasing of the overall profit of the precast component manufacturer is achieved by using a heuristic algorithm and a dynamic order acceptance heuristic.

Results of numerical examples indicate the proposed model realizes the increasing total profit in most cases comparing to accept all of the orders.

Besides, this study tested three order acceptance criteria and found that the profit-based criterion is to be more stable in terms of maximum total profit.

This approach is anticipated to provide support to precast component manufacturers when faced with multiple orders in long-term production.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Jiang, Wen& Wu, Lanjun& Cao, Yunzhong. 2020. Multiple Precast Component Orders Acceptance and Scheduling. Mathematical Problems in Engineering،Vol. 2020, no. 2020, pp.1-15.
https://search.emarefa.net/detail/BIM-1194679

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Jiang, Wen…[et al.]. Multiple Precast Component Orders Acceptance and Scheduling. Mathematical Problems in Engineering No. 2020 (2020), pp.1-15.
https://search.emarefa.net/detail/BIM-1194679

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Jiang, Wen& Wu, Lanjun& Cao, Yunzhong. Multiple Precast Component Orders Acceptance and Scheduling. Mathematical Problems in Engineering. 2020. Vol. 2020, no. 2020, pp.1-15.
https://search.emarefa.net/detail/BIM-1194679

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1194679