Schedule-Allocate and Robust Sequencing in Three-Machine Robotic Cell under Breakdowns

المؤلفون المشاركون

Raissi, Sadigh
Vaisi, Bahareh
Farughi, Hiwa

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-24، 24ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-10-31

دولة النشر

مصر

عدد الصفحات

24

التخصصات الرئيسية

هندسة مدنية

الملخص EN

The purpose of this paper is to model two problems comprising schedule-allocate (in case of producing identical parts) and sequencing of parts (in case of producing different parts).

The first model is used for minimizing the cycle time and operational cost, and the second one for minimizing both the mean and standard deviation of the total production cost as well the cycle time, in an unreliable three-machine robotic cell which confronted with many uncertainty factors.

In the current article, mathematical modelling and simulation-based optimization method have been presented to schedule-allocate similar parts and trace the optimal sequence of different parts.

Several solution procedures, including epsilon-constraint method and multiobjective particle swarm optimization algorithm, for identical parts case and response surface methodology for different parts case are applied.

The results derived from solving numerical examples revealed some advantages in terms of time to attain the optimal solution.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Vaisi, Bahareh& Farughi, Hiwa& Raissi, Sadigh. 2020. Schedule-Allocate and Robust Sequencing in Three-Machine Robotic Cell under Breakdowns. Mathematical Problems in Engineering،Vol. 2020, no. 2020, pp.1-24.
https://search.emarefa.net/detail/BIM-1195274

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Vaisi, Bahareh…[et al.]. Schedule-Allocate and Robust Sequencing in Three-Machine Robotic Cell under Breakdowns. Mathematical Problems in Engineering No. 2020 (2020), pp.1-24.
https://search.emarefa.net/detail/BIM-1195274

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Vaisi, Bahareh& Farughi, Hiwa& Raissi, Sadigh. Schedule-Allocate and Robust Sequencing in Three-Machine Robotic Cell under Breakdowns. Mathematical Problems in Engineering. 2020. Vol. 2020, no. 2020, pp.1-24.
https://search.emarefa.net/detail/BIM-1195274

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1195274