![](/images/graphics-bg.png)
Uniform Asymptotics for a Delay-Claims Risk Model with Constant Force of Interest and By-Claims Arriving according to a Counting Process
المؤلفون المشاركون
المصدر
Mathematical Problems in Engineering
العدد
المجلد 2019، العدد 2019 (31 ديسمبر/كانون الأول 2019)، ص ص. 1-15، 15ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2019-02-07
دولة النشر
مصر
عدد الصفحات
15
التخصصات الرئيسية
الملخص EN
The insurance risk model involving main claims and by-claims has been traditionally studied under the assumption that every main claim may be accompanied with a by-claim occurring after a period of delay, but in reality each main claim can cause many by-claims arriving according to a counting process.
To this end, we construct a new insurance risk model that is also perturbed by diffusion with constant force of interest.
In the presence of heavy tails and dependence structures among modelling components, we obtain some asymptotic results for the finite-time ruin probability and the tail probability of discounted aggregate claims, where the results hold uniformly for all times in a finite or infinite interval.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Gao, Qingwu& Liu, Xijun. 2019. Uniform Asymptotics for a Delay-Claims Risk Model with Constant Force of Interest and By-Claims Arriving according to a Counting Process. Mathematical Problems in Engineering،Vol. 2019, no. 2019, pp.1-15.
https://search.emarefa.net/detail/BIM-1196528
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Gao, Qingwu& Liu, Xijun. Uniform Asymptotics for a Delay-Claims Risk Model with Constant Force of Interest and By-Claims Arriving according to a Counting Process. Mathematical Problems in Engineering No. 2019 (2019), pp.1-15.
https://search.emarefa.net/detail/BIM-1196528
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Gao, Qingwu& Liu, Xijun. Uniform Asymptotics for a Delay-Claims Risk Model with Constant Force of Interest and By-Claims Arriving according to a Counting Process. Mathematical Problems in Engineering. 2019. Vol. 2019, no. 2019, pp.1-15.
https://search.emarefa.net/detail/BIM-1196528
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1196528
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)