A Mathematical Model and a Simulated Annealing Algorithm for Balancing Multi-manned Assembly Line Problem with Sequence-Dependent Setup Time

المؤلفون المشاركون

Cheng, Wenming
Yang, Wucheng

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-16، 16ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-05-23

دولة النشر

مصر

عدد الصفحات

16

التخصصات الرئيسية

هندسة مدنية

الملخص EN

Multi-manned assembly lines have been widely applied to the industrial production, especially for large-sized products such as cars, buses, and trucks, in which more than one operator in the same station simultaneously performs different tasks in parallel.

This study deals with a multi-manned assembly line balancing problem by simultaneously considering the forward and backward sequence-dependent setup time (MALBPS).

A mixed-integer programming is established to characterize the problem.

Besides, a simulated annealing algorithm is also proposed to solve it.

To validate the performance of the proposed approaches, a set of benchmark instances are tested and the lower bound of the proposed problem is also given.

The results demonstrated that the proposed algorithm is quite effective to solve the problem.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Yang, Wucheng& Cheng, Wenming. 2020. A Mathematical Model and a Simulated Annealing Algorithm for Balancing Multi-manned Assembly Line Problem with Sequence-Dependent Setup Time. Mathematical Problems in Engineering،Vol. 2020, no. 2020, pp.1-16.
https://search.emarefa.net/detail/BIM-1201171

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Yang, Wucheng& Cheng, Wenming. A Mathematical Model and a Simulated Annealing Algorithm for Balancing Multi-manned Assembly Line Problem with Sequence-Dependent Setup Time. Mathematical Problems in Engineering No. 2020 (2020), pp.1-16.
https://search.emarefa.net/detail/BIM-1201171

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Yang, Wucheng& Cheng, Wenming. A Mathematical Model and a Simulated Annealing Algorithm for Balancing Multi-manned Assembly Line Problem with Sequence-Dependent Setup Time. Mathematical Problems in Engineering. 2020. Vol. 2020, no. 2020, pp.1-16.
https://search.emarefa.net/detail/BIM-1201171

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1201171