Energy-Saving Production Scheduling in a Single-Machine Manufacturing System by Improved Particle Swarm Optimization

المؤلفون المشاركون

Jiang, Qingquan
Liao, Xiaoya
Zhang, Rui
Lin, Qiaozhen

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-16، 16ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-11-05

دولة النشر

مصر

عدد الصفحات

16

التخصصات الرئيسية

هندسة مدنية

الملخص EN

A single-machine scheduling problem that minimizes the total weighted tardiness with energy consumption constraints in the actual production environment is studied in this paper.

Based on the properties of the problem, an improved particle swarm optimization (PSO) algorithm embedded with a local search strategy (PSO-LS) is designed to solve this problem.

To evaluate the algorithm, some computational experiments are carried out using PSO-LS, basic PSO, and a genetic algorithm (GA).

Before the comparison experiment, the Taguchi method is used to select appropriate parameter values for these three algorithms since heuristic algorithms rely heavily on their parameters.

The experimental results show that the improved PSO-LS algorithm has considerable advantages over the basic PSO and GA, especially for large-scale problems.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Jiang, Qingquan& Liao, Xiaoya& Zhang, Rui& Lin, Qiaozhen. 2020. Energy-Saving Production Scheduling in a Single-Machine Manufacturing System by Improved Particle Swarm Optimization. Mathematical Problems in Engineering،Vol. 2020, no. 2020, pp.1-16.
https://search.emarefa.net/detail/BIM-1201793

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Jiang, Qingquan…[et al.]. Energy-Saving Production Scheduling in a Single-Machine Manufacturing System by Improved Particle Swarm Optimization. Mathematical Problems in Engineering No. 2020 (2020), pp.1-16.
https://search.emarefa.net/detail/BIM-1201793

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Jiang, Qingquan& Liao, Xiaoya& Zhang, Rui& Lin, Qiaozhen. Energy-Saving Production Scheduling in a Single-Machine Manufacturing System by Improved Particle Swarm Optimization. Mathematical Problems in Engineering. 2020. Vol. 2020, no. 2020, pp.1-16.
https://search.emarefa.net/detail/BIM-1201793

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1201793