Contractual Efficiency of PPP Infrastructure Projects: An Incomplete Contract Model
المؤلفون المشاركون
Kobayashi, Kiyoshi
Shi, Lei
Zhang, Lu
Onishi, Masamitsu
Dai, Dashuang
المصدر
Mathematical Problems in Engineering
العدد
المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-13، 13ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2018-04-30
دولة النشر
مصر
عدد الصفحات
13
التخصصات الرئيسية
الملخص EN
This study analyses the contractual efficiency of public-private partnership (PPP) infrastructure projects, with a focus on two financial aspects: the nonrecourse principal and incompleteness of debt contracts.
The nonrecourse principal releases the sponsoring companies from the debt contract when the special purpose vehicle (SPV) established by the sponsoring companies falls into default.
Consequently, all obligations under the debt contract are limited to the liability of the SPV following its default.
Because the debt contract is incomplete, a renegotiation of an additional loan between the bank and the SPV might occur to enable project continuation or liquidation, which in turn influences the SPV’s ex ante strategies (moral hazard).
Considering these two financial features of PPP infrastructure projects, this study develops an incomplete contract model to investigate how the renegotiation triggers ex ante moral hazard and ex post inefficient liquidation.
We derive equilibrium strategies under service fees endogenously determined via bidding and examine the effect of equilibrium strategies on contractual efficiency.
Finally, we propose an optimal combination of a performance guarantee, the government’s termination right, and a service fee to improve the contractual efficiency of PPP infrastructure projects.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Shi, Lei& Zhang, Lu& Onishi, Masamitsu& Kobayashi, Kiyoshi& Dai, Dashuang. 2018. Contractual Efficiency of PPP Infrastructure Projects: An Incomplete Contract Model. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-13.
https://search.emarefa.net/detail/BIM-1206952
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Shi, Lei…[et al.]. Contractual Efficiency of PPP Infrastructure Projects: An Incomplete Contract Model. Mathematical Problems in Engineering No. 2018 (2018), pp.1-13.
https://search.emarefa.net/detail/BIM-1206952
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Shi, Lei& Zhang, Lu& Onishi, Masamitsu& Kobayashi, Kiyoshi& Dai, Dashuang. Contractual Efficiency of PPP Infrastructure Projects: An Incomplete Contract Model. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-13.
https://search.emarefa.net/detail/BIM-1206952
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1206952
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)