Impact Analysis of Travel Time Uncertainty on AGV Catch-Up Conflict and the Associated Dynamic Adjustment

المؤلفون المشاركون

Xu, Bowei
Li, Junjun
Yang, Yongsheng
Postolache, Octavian
Wu, Hua-feng

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-11، 11ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2018-04-19

دولة النشر

مصر

عدد الصفحات

11

التخصصات الرئيسية

هندسة مدنية

الملخص EN

In automated logistics systems, travel time uncertainty can severely affect automated guided vehicle (AGV) conflict and path planning.

Insight is required into how travel time uncertainty affects catch-up conflict, the main AGV conflict in one-way road networks.

Under normal circumstances, the probability formula for catch-up conflict is deduced based on an analysis of AGV catch-up conflict.

The vertex, monotonicity, and symmetry of catch-up conflict probabilities are developed, for symmetrical AGV travel time distribution densities.

A dynamic adjustment method based on conflict probability for AGVs is designed.

The probability features of catch-up conflicts and the performance of the associated dynamic adjustment are simulated and validated for AGVs at an automated container terminal.

The simulation results show that the impact analysis of travel time uncertainty on AGV catch-up conflict is correct, and the dynamic adjustment is effective.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Li, Junjun& Xu, Bowei& Postolache, Octavian& Yang, Yongsheng& Wu, Hua-feng. 2018. Impact Analysis of Travel Time Uncertainty on AGV Catch-Up Conflict and the Associated Dynamic Adjustment. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-11.
https://search.emarefa.net/detail/BIM-1207268

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Li, Junjun…[et al.]. Impact Analysis of Travel Time Uncertainty on AGV Catch-Up Conflict and the Associated Dynamic Adjustment. Mathematical Problems in Engineering No. 2018 (2018), pp.1-11.
https://search.emarefa.net/detail/BIM-1207268

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Li, Junjun& Xu, Bowei& Postolache, Octavian& Yang, Yongsheng& Wu, Hua-feng. Impact Analysis of Travel Time Uncertainty on AGV Catch-Up Conflict and the Associated Dynamic Adjustment. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-11.
https://search.emarefa.net/detail/BIM-1207268

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1207268