Site Selection of Waste-to-Energy (WtE)‎ Plant considering Public Satisfaction by an Extended VIKOR Method

المؤلفون المشاركون

Wu, Yunna
Qin, Lei
Xu, Chuanbo
Ji, Shaoyu

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-17، 17ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2018-11-08

دولة النشر

مصر

عدد الصفحات

17

التخصصات الرئيسية

هندسة مدنية

الملخص EN

Site selection of waste-to-energy (WtE) plant is critically important in the whole life cycle.

Some research has been launched in the WtE plant site selection, but there is still a serious problem called Not In My Back Yard (NIMBY) effect that needs to be solved.

To solve the problem, an improved multigroup VIKOR method is proposed to choose the optimal site and compromised sites.

In the proposed method, the public satisfaction is fully considered where the public is invited as an evaluation group far more than creating general indicators to represent the public acceptance.

First of all, an elaborate criteria system is built to evaluate site options comprehensively and the weights of criteria are identified by Analytic Hierarchy Process (AHP) method.

Then, the interval 2-tuple linguistic information is adopted to assess the ratings for the established criteria.

The interval 2-tuple linguistic ordered weighted averaging (ITL-OWA) operator is utilized to aggregate the opinions of evaluation committee while the opinions of the public are aggregated using weighted average operator.

Finally, a case from south China which shows the computational procedure and the effectiveness of the proposed method is proved.

Last but not least, a sensitivity analysis is conducted by comparing the results with different weights of evaluation group assessments.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Wu, Yunna& Qin, Lei& Xu, Chuanbo& Ji, Shaoyu. 2018. Site Selection of Waste-to-Energy (WtE) Plant considering Public Satisfaction by an Extended VIKOR Method. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-17.
https://search.emarefa.net/detail/BIM-1207858

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Wu, Yunna…[et al.]. Site Selection of Waste-to-Energy (WtE) Plant considering Public Satisfaction by an Extended VIKOR Method. Mathematical Problems in Engineering No. 2018 (2018), pp.1-17.
https://search.emarefa.net/detail/BIM-1207858

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Wu, Yunna& Qin, Lei& Xu, Chuanbo& Ji, Shaoyu. Site Selection of Waste-to-Energy (WtE) Plant considering Public Satisfaction by an Extended VIKOR Method. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-17.
https://search.emarefa.net/detail/BIM-1207858

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1207858