A Biobjective Optimization Model for Deadline Satisfaction in Line-of-Balance Scheduling with Work Interruptions Consideration

المؤلفون المشاركون

Zhang, Qian
Zou, Xin
Zhang, Lihui

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-12، 12ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2018-05-03

دولة النشر

مصر

عدد الصفحات

12

التخصصات الرئيسية

هندسة مدنية

الملخص EN

The line-of-balance (LOB) technique has demonstrated many advantages in scheduling repetitive projects, one of which is that it allows more than one crew to be hired by an activity concurrently.

The deadline satisfaction problem in LOB scheduling (DSPLOB) aims to find an LOB schedule such that the project is completed within a given deadline and the total number of crews is minimized.

Previous studies required a strict application of crew work continuity, which may lead to a decline in the competitiveness of solutions.

This paper introduces work interruptions into the DSPLOB and presents a biobjective optimization model that can balance the two conflicting objectives of minimizing the total number of crews and maximizing work continuity.

An efficient version of the ϵ-constraint method is customized to find all feasible tradeoff solutions.

Then, these solutions are further improved by an automated procedure to reduce the number of interruptions for each activity without deteriorating the performance in both the objectives.

The effectiveness and practicability of the proposed model are verified using a considerable number of instances.

The results show that introducing work interruptions provides more flexibility in reducing the total number of crews under the LOB framework, especially for serial projects with a tight deadline constraint.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Zou, Xin& Zhang, Lihui& Zhang, Qian. 2018. A Biobjective Optimization Model for Deadline Satisfaction in Line-of-Balance Scheduling with Work Interruptions Consideration. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-12.
https://search.emarefa.net/detail/BIM-1208476

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Zou, Xin…[et al.]. A Biobjective Optimization Model for Deadline Satisfaction in Line-of-Balance Scheduling with Work Interruptions Consideration. Mathematical Problems in Engineering No. 2018 (2018), pp.1-12.
https://search.emarefa.net/detail/BIM-1208476

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Zou, Xin& Zhang, Lihui& Zhang, Qian. A Biobjective Optimization Model for Deadline Satisfaction in Line-of-Balance Scheduling with Work Interruptions Consideration. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-12.
https://search.emarefa.net/detail/BIM-1208476

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1208476