Planning of Electric Power Systems Considering Virtual Power Plants with Dispatchable Loads Included: An Inexact Two-Stage Stochastic Linear Programming Model

المؤلفون المشاركون

Zhou, C. Y.
Huang, G. H.
Chen, J. P.

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-12، 12ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2018-08-30

دولة النشر

مصر

عدد الصفحات

12

التخصصات الرئيسية

هندسة مدنية

الملخص EN

In this study, an inexact two-stage stochastic linear programming (ITSLP) method is proposed for supporting sustainable management of electric power system under uncertainties.

Methods of interval-parameter programming and two-stage stochastic programming were incorporated to tackle uncertainties expressed as interval values and probability distributions.

The dispatchable loads are integrated into the framework of the virtual power plants, and the support vector regression technique is applied to the prediction of electricity demand.

For demonstrating the effectiveness of the developed approach, ITSLP is applied to a case study of a typical planning problem of power system considering virtual power plants.

The results indicate that reasonable solutions for virtual power plant management practice have been generated, which can provide strategies in mitigating pollutant emissions, reducing system costs, and improving the reliability of power supply.

ITSLP is more reliable for the risk-aversive planners in handling high-variability conditions by considering peak-electricity demand and the associated recourse costs attributed to the stochastic event.

The solutions will help decision makers generate alternatives in the event of the insufficient power supply and offer insight into the tradeoffs between economic and environmental objectives.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Zhou, C. Y.& Huang, G. H.& Chen, J. P.. 2018. Planning of Electric Power Systems Considering Virtual Power Plants with Dispatchable Loads Included: An Inexact Two-Stage Stochastic Linear Programming Model. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-12.
https://search.emarefa.net/detail/BIM-1208686

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Zhou, C. Y.…[et al.]. Planning of Electric Power Systems Considering Virtual Power Plants with Dispatchable Loads Included: An Inexact Two-Stage Stochastic Linear Programming Model. Mathematical Problems in Engineering No. 2018 (2018), pp.1-12.
https://search.emarefa.net/detail/BIM-1208686

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Zhou, C. Y.& Huang, G. H.& Chen, J. P.. Planning of Electric Power Systems Considering Virtual Power Plants with Dispatchable Loads Included: An Inexact Two-Stage Stochastic Linear Programming Model. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-12.
https://search.emarefa.net/detail/BIM-1208686

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1208686