Strain Analysis of the Nuozhadu High Rockfill Dam during Initial Impoundment

المؤلفون المشاركون

Chi, Shichun
Lv, Xiaolong

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-12، 12ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2018-07-30

دولة النشر

مصر

عدد الصفحات

12

التخصصات الرئيسية

هندسة مدنية

الملخص EN

The safety of rockfill dams during initial impoundment has always been an issue of interest for regulatory agencies.

Specifically, it is necessary to identify potential tensile strain zones and shear strain concentration zones in which cracks may form.

In this paper, a meshless smoothing method is proposed to construct the strain field of a prototype dam based on monitoring displacement data.

For verification, this method is applied to calculate the strain field of the Nuozhadu core wall rockfill dam.

The results show that the proposed method can provide regulatory agencies with an effective tool for dam inspection during initial impoundment.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Lv, Xiaolong& Chi, Shichun. 2018. Strain Analysis of the Nuozhadu High Rockfill Dam during Initial Impoundment. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-12.
https://search.emarefa.net/detail/BIM-1208792

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Lv, Xiaolong& Chi, Shichun. Strain Analysis of the Nuozhadu High Rockfill Dam during Initial Impoundment. Mathematical Problems in Engineering No. 2018 (2018), pp.1-12.
https://search.emarefa.net/detail/BIM-1208792

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Lv, Xiaolong& Chi, Shichun. Strain Analysis of the Nuozhadu High Rockfill Dam during Initial Impoundment. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-12.
https://search.emarefa.net/detail/BIM-1208792

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1208792