A Mathematical Model for Multiworkshop IPPS Problem in Batch Production

المؤلفون المشاركون

Liu, Yong
Yang, Mingshun
Ba, Li
Gao, Xinqin
Wu, Xueliang
Miao, Zhihong
Li, Yan

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-16، 16ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2018-03-20

دولة النشر

مصر

عدد الصفحات

16

التخصصات الرئيسية

هندسة مدنية

الملخص EN

Integrated Process Planning and Scheduling (IPPS) problem is an important issue in production scheduling.

Actually, there exit many factors affecting scheduling results.

Many types of workpieces are commonly manufactured in batch production.

Moreover, due to differences among process methods, all processes of a workpiece may not be performed in the same workshop or even in the same factory.

For making IPPS problem more in line with practical manufacturing, this paper addresses an IPPS problem with batches and limited vehicles (BV-IPPS).

An equal batch splitting strategy is adopted.

A model for BV-IPPS problem is established.

Makespan is the objective to be minimized.

For solving the complex problem, a particle swarm optimization (PSO) with a multilayer encoding structure is proposed.

Each module of the algorithm is designed.

Finally, case studies have been conducted to validate the model and algorithm.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Ba, Li& Li, Yan& Yang, Mingshun& Wu, Xueliang& Liu, Yong& Gao, Xinqin…[et al.]. 2018. A Mathematical Model for Multiworkshop IPPS Problem in Batch Production. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-16.
https://search.emarefa.net/detail/BIM-1209074

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Ba, Li…[et al.]. A Mathematical Model for Multiworkshop IPPS Problem in Batch Production. Mathematical Problems in Engineering No. 2018 (2018), pp.1-16.
https://search.emarefa.net/detail/BIM-1209074

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Ba, Li& Li, Yan& Yang, Mingshun& Wu, Xueliang& Liu, Yong& Gao, Xinqin…[et al.]. A Mathematical Model for Multiworkshop IPPS Problem in Batch Production. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-16.
https://search.emarefa.net/detail/BIM-1209074

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1209074