A Mathematical Model for Multiworkshop IPPS Problem in Batch Production
المؤلفون المشاركون
Liu, Yong
Yang, Mingshun
Ba, Li
Gao, Xinqin
Wu, Xueliang
Miao, Zhihong
Li, Yan
المصدر
Mathematical Problems in Engineering
العدد
المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-16، 16ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2018-03-20
دولة النشر
مصر
عدد الصفحات
16
التخصصات الرئيسية
الملخص EN
Integrated Process Planning and Scheduling (IPPS) problem is an important issue in production scheduling.
Actually, there exit many factors affecting scheduling results.
Many types of workpieces are commonly manufactured in batch production.
Moreover, due to differences among process methods, all processes of a workpiece may not be performed in the same workshop or even in the same factory.
For making IPPS problem more in line with practical manufacturing, this paper addresses an IPPS problem with batches and limited vehicles (BV-IPPS).
An equal batch splitting strategy is adopted.
A model for BV-IPPS problem is established.
Makespan is the objective to be minimized.
For solving the complex problem, a particle swarm optimization (PSO) with a multilayer encoding structure is proposed.
Each module of the algorithm is designed.
Finally, case studies have been conducted to validate the model and algorithm.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Ba, Li& Li, Yan& Yang, Mingshun& Wu, Xueliang& Liu, Yong& Gao, Xinqin…[et al.]. 2018. A Mathematical Model for Multiworkshop IPPS Problem in Batch Production. Mathematical Problems in Engineering،Vol. 2018, no. 2018, pp.1-16.
https://search.emarefa.net/detail/BIM-1209074
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Ba, Li…[et al.]. A Mathematical Model for Multiworkshop IPPS Problem in Batch Production. Mathematical Problems in Engineering No. 2018 (2018), pp.1-16.
https://search.emarefa.net/detail/BIM-1209074
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Ba, Li& Li, Yan& Yang, Mingshun& Wu, Xueliang& Liu, Yong& Gao, Xinqin…[et al.]. A Mathematical Model for Multiworkshop IPPS Problem in Batch Production. Mathematical Problems in Engineering. 2018. Vol. 2018, no. 2018, pp.1-16.
https://search.emarefa.net/detail/BIM-1209074
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1209074
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر