The key performance indicator for five construction projects in Khartoum state : case study

عدد الاستشهادات بقاعدة ارسيف : 
2

المؤلفون المشاركون

Hasan, Awad Sad
Hamdan, Rabab M.
Muhammad, Salma Y.
al-Jani, Tawasul A.

المصدر

Journal of Science and Technology : in Engineering and Computer Sciences

العدد

المجلد 21، العدد 2 (31 ديسمبر/كانون الأول 2020)، ص ص. 56-63، 8ص.

الناشر

جامعة السودان للعلوم و التكنولوجيا عمادة البحث العلمي

تاريخ النشر

2020-12-31

دولة النشر

السودان

عدد الصفحات

8

التخصصات الرئيسية

الكيمياء

الملخص EN

Performance measurement is continuous observing and period follow-up of the project achievements which achieved by the specified cost, time, quality and specifications required to satisfy the owner and customer., this study aimed to identify the performance measurement indicators that affect the project and verify that, the means of follow-up and monitoring are used probably to transfer resources to the project system.

To verify that, we based on the criteria and equations of the indicator’s measurement according to the methodology of (KPI GROUP 2000) .It was applied to five housing projects in Khartoum State., then application of standards and equations are applied and the results were analyzed which indicated that the reasons of unsatisfactory results are due to the absence of follow-up and monitoring means, interpreted in exchange rate and insufficient planning and scheduling.

In order to verify the company's experience with these concepts and how to calculate the completion rates, a field survey was conducted as a second part, then a questionnaire distributed to several companies’ sector in Khartoum State.

So, the descriptive analytical method which is based on the study of reality and phenomenon was used and implemented to the targeted sample study in a company which included the project manager or planning manager according to their scientific degrees, then data was analyzed using the statistical analysis program( package 2019), so most important results were appeared which represented in the absence of advanced means of monitoring and lack of knowledge of the concept or application of performance measurement indicators.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Hamdan, Rabab M.& Hasan, Awad Sad& Muhammad, Salma Y.& al-Jani, Tawasul A.. 2020. The key performance indicator for five construction projects in Khartoum state : case study. Journal of Science and Technology : in Engineering and Computer Sciences،Vol. 21, no. 2, pp.56-63.
https://search.emarefa.net/detail/BIM-1275356

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Hamdan, Rabab M.…[et al.]. The key performance indicator for five construction projects in Khartoum state : case study. Journal of Science and Technology : in Engineering and Computer Sciences Vol. 21, no. 2 (2020), pp.56-63.
https://search.emarefa.net/detail/BIM-1275356

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Hamdan, Rabab M.& Hasan, Awad Sad& Muhammad, Salma Y.& al-Jani, Tawasul A.. The key performance indicator for five construction projects in Khartoum state : case study. Journal of Science and Technology : in Engineering and Computer Sciences. 2020. Vol. 21, no. 2, pp.56-63.
https://search.emarefa.net/detail/BIM-1275356

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references : p. 63

رقم السجل

BIM-1275356