Determination of upper and lower limits of concession period for ppp projects using probabilistic NPV

المؤلفون المشاركون

al-Dasuqi, Adil I.
al-Baz, Muhammad M.

المصدر

Journal of Engineering Research

العدد

المجلد 2019، العدد 3، ج. 3 (30 سبتمبر/أيلول 2019)، ص ص. 31-39، 9ص.

الناشر

جامعة طنطا كلية الهندسة

تاريخ النشر

2019-09-30

دولة النشر

مصر

عدد الصفحات

9

التخصصات الرئيسية

الهندسة المدنية

الموضوعات

الملخص EN

This paper provides a methodology to determine the upper and lower limits of concession period of public private partnerships that would be useful both to the public and the private sector with the impact of risks and uncertainties taken into consideration.

The model uses Monte Carlo simulation to evaluate the effect of risks and uncertainties on the concession period.

Net present value (NPV) analysis is used for financial evaluation.

To demonstrate the applicability of the proposed model, hypothetical public private partnership (PPP) rail way project in Egypt was used a case study.

After applying the model accurate results are obtained.

However, using this model gives the practitioners a clearly vision about the value of concession period insuring that the private sector doesn't lose his investment and the government can benefit from the project before end of its service life.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

al-Baz, Muhammad M.& al-Dasuqi, Adil I.. 2019. Determination of upper and lower limits of concession period for ppp projects using probabilistic NPV. Journal of Engineering Research،Vol. 2019, no. 3، ج. 3, pp.31-39.
https://search.emarefa.net/detail/BIM-1363884

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

al-Baz, Muhammad M.& al-Dasuqi, Adil I.. Determination of upper and lower limits of concession period for ppp projects using probabilistic NPV. Journal of Engineering Research No. 3, p. 3 (Sep. 2019), pp.31-39.
https://search.emarefa.net/detail/BIM-1363884

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

al-Baz, Muhammad M.& al-Dasuqi, Adil I.. Determination of upper and lower limits of concession period for ppp projects using probabilistic NPV. Journal of Engineering Research. 2019. Vol. 2019, no. 3، ج. 3, pp.31-39.
https://search.emarefa.net/detail/BIM-1363884

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references : p. 39

رقم السجل

BIM-1363884