Improve implementing mega building envelope upon arriving material using lean six sigma : case study
المؤلفون المشاركون
المصدر
العدد
المجلد 2021، العدد 169 (31 مارس/آذار 2021)، ص ص. 1-20، 20ص.
الناشر
جامعة حلوان كلية الهندسة بالمطرية
تاريخ النشر
2021-03-31
دولة النشر
مصر
عدد الصفحات
20
التخصصات الرئيسية
الموضوعات
الملخص EN
The functional performance of a building envelope depends on the correctspecifications of the individual components that make up the envelope mountingsystem, the quality of manufacture of these components, and thus the installationstandard.
Good performance also requires a high degree of interaction betweenbuilding envelope installations.
This interaction requires identifying activities that complement each other, and thus the strength and willingness of those wanted to request a "whole buildingenvelope".
Therefore, well-installed envelope can ensure that occupants haveproductive and healthy indoor environments.
This paper proposed a methodology by integration three different framework(Lean, Six-Sigma and mega building envelope installation) during a systematicapproach to improve building envelope installation and eliminate redundant timeand materials, upon arriving material to the site.
Our aim was to demonstrate through a project in hotel towers in Egypt inCairo - Maadi (upon the arrival of mega enveloping materials for construction)that the methodology has the potential to reduce material waste, time duration, andpotential savings while integrating (Lean, Six Sigma framework using their tools)In the framework of implementing the mega building envelope upon arrival ofmaterials} inspired by the work and practices of various building envelopescompanies.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Salamah, Inas& Khalil, Nisrin. 2021. Improve implementing mega building envelope upon arriving material using lean six sigma : case study. Engineering Research Journal،Vol. 2021, no. 169, pp.1-20.
https://search.emarefa.net/detail/BIM-1364989
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Salamah, Inas& Khalil, Nisrin. Improve implementing mega building envelope upon arriving material using lean six sigma : case study. Engineering Research Journal No. 169 (2021), pp.1-20.
https://search.emarefa.net/detail/BIM-1364989
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Salamah, Inas& Khalil, Nisrin. Improve implementing mega building envelope upon arriving material using lean six sigma : case study. Engineering Research Journal. 2021. Vol. 2021, no. 169, pp.1-20.
https://search.emarefa.net/detail/BIM-1364989
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
-
رقم السجل
BIM-1364989
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر