![](/images/graphics-bg.png)
The role of integration between the earned value management model and the value flow map in rationalizing the costs of construction projects : applied research in al-Rasheed general company for construction contracting
المؤلفون المشاركون
Yaqub, Fayha Abd Allah
Abd al-Aziz, Inas Sad
المصدر
الناشر
جامعة بغداد المعهد العالي للدراسات المحاسبية و المالية
تاريخ النشر
2021-12-31
دولة النشر
العراق
عدد الصفحات
17
التخصصات الرئيسية
الملخص الإنجليزي
The research problem is that most of the construction projects exceed the planned value, due to the failure to implement the plans on time.
The current study aims to monitor the implementation of the project and for each of the executed tasks of the table of quantities in order to detect deviations at the time they occur, evaluate the time and cost performance, and then identify the areas of waste and analyze the implementation of each task in order to diagnose the underlying problems and find possible and applicable solutions in the environment Iraqi.
The research was applied in one of the companies specialized in the field of construction projects, and one of the most important conclusions reached is the possibility of applying the Earned value management model to the tasks executed during the work stages, as well as the possibility of applying a value stream map to construction projects to rationalize their costs.
نوع البيانات
أوراق مؤتمرات
رقم السجل
BIM-1385844
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Abd al-Aziz, Inas Sad& Yaqub, Fayha Abd Allah. 2021-12-31. The role of integration between the earned value management model and the value flow map in rationalizing the costs of construction projects : applied research in al-Rasheed general company for construction contracting. The International Scientific Conference and national : Leadership and Creativity in Building Financial and Accounting Policies in Economic Units (2 : 2021 : University of Baghdad, Iraq). . Special issue (2021), pp.1-17.Baghdad Iraq : University of Baghdad Post Graduate Institute for Accounting and Finance Studies.
https://search.emarefa.net/detail/BIM-1385844
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Abd al-Aziz, Inas Sad& Yaqub, Fayha Abd Allah. The role of integration between the earned value management model and the value flow map in rationalizing the costs of construction projects : applied research in al-Rasheed general company for construction contracting. . Baghdad Iraq : University of Baghdad Post Graduate Institute for Accounting and Finance Studies. 2021-12-31.
https://search.emarefa.net/detail/BIM-1385844
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Abd al-Aziz, Inas Sad& Yaqub, Fayha Abd Allah. The role of integration between the earned value management model and the value flow map in rationalizing the costs of construction projects : applied research in al-Rasheed general company for construction contracting. . The International Scientific Conference and national : Leadership and Creativity in Building Financial and Accounting Policies in Economic Units (2 : 2021 : University of Baghdad, Iraq).
https://search.emarefa.net/detail/BIM-1385844
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)