Factors affecting construction projects' cost estimating
المؤلفون المشاركون
Umar, Aminah Hasan al-Sayyid
Umar, Nimah Hasan al-Sayyid
المصدر
Fayoum University Journal of Engineering
العدد
المجلد 5، العدد 2 (31 يوليو/تموز 2022)، ص ص. 26-41، 16ص.
الناشر
تاريخ النشر
2022-07-31
دولة النشر
مصر
عدد الصفحات
16
التخصصات الرئيسية
الموضوعات
الملخص EN
A construction project's success depends on its planning, accurate cost estimat-ing is critical in both public and private enterprises.
Public building projects in Saudi Arabia have been plagued by enormous overruns and delays over the previ-ous three decades due to poor construction performance.
The purpose of the re-search is determining the most critical factors affecting the accuracy of Saudi Ara-bian public project construction cost estimates.
A questionnaire survey was given to 100 participants at random, 95 of whom were males and 5 of whom were women, in order to acquire data.
Cost estimates for Saudi public building projects are af-fected by financial concerns, the bidding situation and project features, as well as the estimation technique.
The results found that the main factor related to financial issues.
And the most significant factors of financial issues, which affecting cost estimates are financial status of client market, the unstable economic situation, cost estimation accuracy, financial resource availability, punctuality of cost flow as well as the availability of high quality financial plans and accurate estimation.
Be-sides, the most significant factors of bidding situation, which affecting cost esti-mates are designer and design quality, company's strength and reputation in the construction industry, and amount of experience on such projects.
Furthermore, the most significant factors of project characteristics, which affecting cost estimates are project manager competence, owners' requirement, Project specification and requirement, as well as project duration.
Finally, the most significant factors of estimating process, which affecting cost estimates are project team's experience, time allowed for preparing estimates and availability of cost indices.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Umar, Aminah Hasan al-Sayyid& Umar, Nimah Hasan al-Sayyid. 2022. Factors affecting construction projects' cost estimating. Fayoum University Journal of Engineering،Vol. 5, no. 2, pp.26-41.
https://search.emarefa.net/detail/BIM-1454186
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Umar, Aminah Hasan al-Sayyid& Umar, Nimah Hasan al-Sayyid. Factors affecting construction projects' cost estimating. Fayoum University Journal of Engineering Vol. 5, no. 2 (2022), pp.26-41.
https://search.emarefa.net/detail/BIM-1454186
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Umar, Aminah Hasan al-Sayyid& Umar, Nimah Hasan al-Sayyid. Factors affecting construction projects' cost estimating. Fayoum University Journal of Engineering. 2022. Vol. 5, no. 2, pp.26-41.
https://search.emarefa.net/detail/BIM-1454186
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
-
رقم السجل
BIM-1454186
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر