Time schedule preparation by predicting production rate using simulation : case study : beach camp shore protection

العناوين الأخرى

تحضير الجداول الزمنية عن طريق قياس معدل الإنتاج باستخدام تقنية المحاكاة في قطاع غزة

مقدم أطروحة جامعية

Yahya, Ali Abd al-Fattah

مشرف أطروحة جامعية

Rustum, Rifat N.

الجامعة

الجامعة الإسلامية

الكلية

كلية الهندسة

القسم الأكاديمي

قسم الهندسة المدنية

دولة الجامعة

فلسطين (قطاع غزة)

الدرجة العلمية

ماجستير

تاريخ الدرجة العلمية

2003

الملخص الإنجليزي

This study is intended to investigate the problem of scheduling engineering projects utilizing the production rates by the simulation.

The main goal of this study is to improve the scheduling of projects and productivity estimation in the construction industry in Gaza Strip The present investigation consists of two main parts.

The first part is a field survey “questionnaires” accompanied by personal interviews.

The Field survey is included to highlight the local factors affecting productivity and the methods used for estimating productivity in Gaza Strip.

Forty-five questionnaires were distributed to contractors from which forty questionnaires were received and analyzed.

The collected data reflected different size, types, and characteristics of the sample population.

The second part is a case study based on an ongoing project in Gaza Strip.

The study is intended to demonstrate the use of simulation in estimating productivity based on the actual measurement of the durations of the activities of the project.

The observation data were analyzed and fitted to Beta distribution functions.

This study focuses on the application of simulation technique for modeling and simulation an ongoing project in Gaza Strip with the intention to conclude the appropriate project construction production rates and time probabilistic during the planning and implementation the projects.

Also, the present investigation shows that there is a need to train the contractors and improve their abilities to use the productivity measurement methods for time scheduling.

التخصصات الرئيسية

الهندسة المدنية

الموضوعات

عدد الصفحات

137

قائمة المحتويات

Table of contents.

Abstract.

Chapter one : Introduction.

Chapter two : Literature review.

Chapter three : Part (I) field survey.

Chapter four : Part (II): productivity measurement using simulation process case study.

Chapter five : Conclusion and recommendations.

References.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Yahya, Ali Abd al-Fattah. (2003). Time schedule preparation by predicting production rate using simulation : case study : beach camp shore protection. (Master's theses Theses and Dissertations Master). Islamic University, Palestine (Gaza Strip)
https://search.emarefa.net/detail/BIM-300879

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Yahya, Ali Abd al-Fattah. Time schedule preparation by predicting production rate using simulation : case study : beach camp shore protection. (Master's theses Theses and Dissertations Master). Islamic University. (2003).
https://search.emarefa.net/detail/BIM-300879

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Yahya, Ali Abd al-Fattah. (2003). Time schedule preparation by predicting production rate using simulation : case study : beach camp shore protection. (Master's theses Theses and Dissertations Master). Islamic University, Palestine (Gaza Strip)
https://search.emarefa.net/detail/BIM-300879

لغة النص

الإنجليزية

نوع البيانات

رسائل جامعية

رقم السجل

BIM-300879