![](/images/graphics-bg.png)
Factors that hamper the implementation of constructability in the Gaza Strip
مقدم أطروحة جامعية
مشرف أطروحة جامعية
الجامعة
الجامعة الإسلامية
الكلية
كلية الهندسة
القسم الأكاديمي
قسم الهندسة المدنية
دولة الجامعة
فلسطين (قطاع غزة)
الدرجة العلمية
ماجستير
تاريخ الدرجة العلمية
2008
الملخص الإنجليزي
The subject of this research is about the barriers of constructability implementation in the Gaza strip.
Therefore, this research aims at identifying the current implementation of constructability in the Gaza strip, clarifying the essential factors that hamper the implementation of constructability in the Gaza strip and clarifying solutions, whenever possible, that would help the participants to apply the constructability principles, in addition to develop guidelines for the practitioners of the construction industry.
The present investigation consists of literature review in subjects related to constructability to determine the hampering factors.
Interviews with experts and from the researcher experience a questionnaire was designed incorporating all possible hampering factors in the Gaza strip.
The questionnaire is divided into two parts : The first part is related to the importance and effect of the barrier factors in construction industry in general.
This part was completed by one of the main players of a project (Contractor, Consultant, Owner or their representatives).
The second part is related to the degree of existence of these barrier factors in the project under study.
This part is completed by the researcher, from the project documents and through interviews with one or more of those who engaged in the project under study.
This research includes 28 case studies (projects), the result of data analysis of the respondents' answers and the case studies showed the followings : 1.
All hampering factors were given a high rating by respondents in terms of the importance and effect of the barrier factors in construction industry.
2.
About 54 % of the respondents have never heard of the constructability and its concepts before.
3.
The political factors and project management factors have scored the highest rate amongst the nine main factors that hamper the implementation of constructability in the Gaza strip 4.
Nature of the project factors and knowledge and experience factors has scored the lowest rate amongst the nine main factors that hamper the implementation of constructability in the Gaza strip.
5.
Recurrent closure of crossings and absence of preassembling before project's execution have scored the highest rate amongst the 56 sub-factors that hamper the implementation of constructability in the Gaza strip.
6.
Project remoteness and lack of utilities and type of contract have scored the least rate amongst the 56 sub-factors that hamper the implementation of constructability in the Gaza strip Finally, the researcher has designed a framework that acts as a guideline for the construction industry's PR actioners to overcome barriers of constructability, in accordance with the appearance of the barrier factors in the project life cycle, in order to achieve the desired project objectives.
التخصصات الرئيسية
الموضوعات
عدد الصفحات
127
قائمة المحتويات
Table of contents.
Abstract.
Chapter one : Introduction.
Chapter two : Literature review.
Chapter three : Research methodology.
Chapter four : Results, data analysis and discussion.
Chapter five : Constructability framework.
Chapter six : Conclusion and recommendations.
References.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
al-Hurani, Imad M.. (2008). Factors that hamper the implementation of constructability in the Gaza Strip. (Master's theses Theses and Dissertations Master). Islamic University, Palestine (Gaza Strip)
https://search.emarefa.net/detail/BIM-301282
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
al-Hurani, Imad M.. Factors that hamper the implementation of constructability in the Gaza Strip. (Master's theses Theses and Dissertations Master). Islamic University. (2008).
https://search.emarefa.net/detail/BIM-301282
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
al-Hurani, Imad M.. (2008). Factors that hamper the implementation of constructability in the Gaza Strip. (Master's theses Theses and Dissertations Master). Islamic University, Palestine (Gaza Strip)
https://search.emarefa.net/detail/BIM-301282
لغة النص
الإنجليزية
نوع البيانات
رسائل جامعية
رقم السجل
BIM-301282
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)