Split assignment with transportation model for job-shop loading : case study

المؤلف

Mahmud, Khalil Ibrahim

المصدر

Journal of Engineering

العدد

المجلد 15، العدد 2 (30 يونيو/حزيران 2009)، ص ص. 3812-3825، 14ص.

الناشر

جامعة بغداد كلية الهندسة

تاريخ النشر

2009-06-30

دولة النشر

العراق

عدد الصفحات

14

التخصصات الرئيسية

الهندسة الميكانيكية

الملخص EN

The aim of this paper, is to analyze the assignment problem in industry where the constraint of allowing to allocate only one job to each machine is relaxed.

Thus, splitting the job is permitted and processed by more than one machine.

The problem is demonstrated with a real life case study.

We solved the problem by splitting the jobs and converting lot of jobs as well as the actual hours of each machine to Standard Machine Hours (SMH).

Transportation model is also suggested to overcome the problem, and the optimum solution is obtained by using POM software

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Mahmud, Khalil Ibrahim. 2009. Split assignment with transportation model for job-shop loading : case study. Journal of Engineering،Vol. 15, no. 2, pp.3812-3825.
https://search.emarefa.net/detail/BIM-327430

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Mahmud, Khalil Ibrahim. Split assignment with transportation model for job-shop loading : case study. Journal of Engineering Vol. 15, no. 2 (Jun. 2009), pp.3812-3825.
https://search.emarefa.net/detail/BIM-327430

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Mahmud, Khalil Ibrahim. Split assignment with transportation model for job-shop loading : case study. Journal of Engineering. 2009. Vol. 15, no. 2, pp.3812-3825.
https://search.emarefa.net/detail/BIM-327430

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references : p. 3825

رقم السجل

BIM-327430