Design of concession period considering risk management for a road project
المؤلفون المشاركون
Bagui, Swapan Kumar
Ghosh, Ambarish
المصدر
Jordan Journal of Civil Engineering
العدد
المجلد 7، العدد 4 (31 ديسمبر/كانون الأول 2013)، ص ص. 401-418، 18ص.
الناشر
جامعة العلوم و التكنولوجيا الأردنية عمادة البحث العلمي
تاريخ النشر
2013-12-31
دولة النشر
الأردن
عدد الصفحات
18
التخصصات الرئيسية
الموضوعات
الملخص EN
The design of concession period for build–operate–transfer (BOT) projects is crucial to financial viability and completion risk management.
A systematic analysis shows that concession period design involves the design of concession period structure as well as the determination of the concession period length.
The concession period may have a single-period structure or a two-period structure; its length may be fixed or variable.
Different designs reflect different risk control strategies for completion time overruns.
The single-period concession structure requires the project company to assume completion risk, while the two-period concession structure could, to some extent, reduce the completion risk exposure to the project company, depending on the various parameters.
Through Monte Carlo simulation, this paper evaluates the mean net present value (NPV), variance and NPV-at-risk of different concession period structures, so that both the government and the concessionaires can understand their risk exposure and rewards.
The paper then analyzes the influence of project characteristics on concession period design to evaluate the feasibility of the design.
Expected concession period has been calculated using Monte Carlo simulation method, and expected concession periods have been found to be 28.25 years and 26.46 years based on level of service and 95 % risk consideration.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Bagui, Swapan Kumar& Ghosh, Ambarish. 2013. Design of concession period considering risk management for a road project. Jordan Journal of Civil Engineering،Vol. 7, no. 4, pp.401-418.
https://search.emarefa.net/detail/BIM-340304
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Bagui, Swapan Kumar& Ghosh, Ambarish. Design of concession period considering risk management for a road project. Jordan Journal of Civil Engineering Vol. 7, no. 4 (2013), pp.401-418.
https://search.emarefa.net/detail/BIM-340304
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Bagui, Swapan Kumar& Ghosh, Ambarish. Design of concession period considering risk management for a road project. Jordan Journal of Civil Engineering. 2013. Vol. 7, no. 4, pp.401-418.
https://search.emarefa.net/detail/BIM-340304
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references : p. 417-418
رقم السجل
BIM-340304
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر