![](/images/graphics-bg.png)
Guideline for preparing comprehensive extension of time (EoT) claim
المؤلفون المشاركون
al-Nas, Khalid Ahmad Ali
Khalil, Ayman Husayn Husni
Nassar, Jamal al-Din
المصدر
Housing and Building National Research Center Journal
العدد
المجلد 10، العدد 3 (31 ديسمبر/كانون الأول 2014)، ص ص. 308-316، 9ص.
الناشر
المركز القومي لبحوث الإسكان و البناء
تاريخ النشر
2014-12-31
دولة النشر
مصر
عدد الصفحات
9
التخصصات الرئيسية
الموضوعات
الملخص EN
Any project faces delays and disruptions especially the mega / complex projects of today, with many interfaces.
Proving delay and / or disruption is not an easy task and it is a time consuming process especially in the mega / complex projects with thousands of activities, lots of details and interfaces with the involvement of many stakeholders.
The different methods that are used to prove delays, as explained in industry standards and handbooks, are theoretical and could be applied in the small simple projects with few numbers of activities but the same methods cannot easily be applied on mega / complex projects.
Proving delays in mega / complex projects, whose schedules contain thousands of activities with many interfaces and lot of causes for delay and disruption is a complicated process and involves lots of details.
When any degree of complexity in the project is examined, it becomes more difficult for the project team to record the delays and disruption events properly because they are always busy dealing with the site issues and other project pressures.
In order for the contractors to be successful, a time extension claim or disruption claims should adequately establish causation and liability and assist in demonstrating the extend of time-related damages experienced as a direct result of the delay events relied upon.
The process of recording the delays and disruption is a dynamic process and needs continuous involvement from the planning team with the support from all other departments.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
al-Nas, Khalid Ahmad Ali& Khalil, Ayman Husayn Husni& Nassar, Jamal al-Din. 2014. Guideline for preparing comprehensive extension of time (EoT) claim. Housing and Building National Research Center Journal،Vol. 10, no. 3, pp.308-316.
https://search.emarefa.net/detail/BIM-424093
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
al-Nas, Khalid Ahmad Ali…[et al.]. Guideline for preparing comprehensive extension of time (EoT) claim. Housing and Building National Research Center Journal Vol. 10, no. 3 (2014), pp.308-316.
https://search.emarefa.net/detail/BIM-424093
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
al-Nas, Khalid Ahmad Ali& Khalil, Ayman Husayn Husni& Nassar, Jamal al-Din. Guideline for preparing comprehensive extension of time (EoT) claim. Housing and Building National Research Center Journal. 2014. Vol. 10, no. 3, pp.308-316.
https://search.emarefa.net/detail/BIM-424093
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references : p. 316
رقم السجل
BIM-424093
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)