Selection of Key Component Vendor from the Aspects of Capability, Productivity, and Reliability

المؤلفون المشاركون

Kuo, Catherine W.
Dat, Luu Quoc
Yu, Vincent F.

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-7، 7ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-07-02

دولة النشر

مصر

عدد الصفحات

7

التخصصات الرئيسية

هندسة مدنية

الملخص EN

In a technology-driven industry, the appropriate vendors/suppliers can effectively contribute to cobusiness development profits.

Key component vendors help dynamically drive solution design firms to achieve strong performances, especially when an integrated circuit (IC) component that has technical know-how specifications dominates an electronic solution design.

This paper presents a systematic framework to examine the decision process for the selection of wireless fidelity (Wi-Fi) IC vendor alternatives from the business ecosystem aspect in order to review the importance of buyer-supplier synergistic effects.

We implement the fuzzy analytic hierarchy process technique which incorporates a vendor’s capability, productivity, and reliability characteristics into a hierarchical structure and deploys decision experts’ judgments along with vague data analysis to solve a real-world problem faced by a leading company specialized in the research and design of wireless networking solutions.

The findings indicate the Taiwanese local vendor is the top priority for alternatives selection, and the results contribute significant values to the design firm’s operation management.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Yu, Vincent F.& Kuo, Catherine W.& Dat, Luu Quoc. 2014. Selection of Key Component Vendor from the Aspects of Capability, Productivity, and Reliability. Mathematical Problems in Engineering،Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-447516

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Yu, Vincent F.…[et al.]. Selection of Key Component Vendor from the Aspects of Capability, Productivity, and Reliability. Mathematical Problems in Engineering No. 2014 (2014), pp.1-7.
https://search.emarefa.net/detail/BIM-447516

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Yu, Vincent F.& Kuo, Catherine W.& Dat, Luu Quoc. Selection of Key Component Vendor from the Aspects of Capability, Productivity, and Reliability. Mathematical Problems in Engineering. 2014. Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-447516

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-447516