Risk-Based Allowed Outage Time and Surveillance Test Interval Extensions for Angra 1

المؤلفون المشاركون

e Melo, P. F. Frutuoso
Bogado Leite, Sérgio Q.
Orlando Gibelli, Sonia M.

المصدر

International Journal of Quality, Statistics, and Reliability

العدد

المجلد 2012، العدد 2012 (31 ديسمبر/كانون الأول 2012)، ص ص. 1-13، 13ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2012-07-05

دولة النشر

مصر

عدد الصفحات

13

التخصصات الرئيسية

العلوم الاقتصادية والمالية وإدارة الأعمال
الاقتصاد

الملخص EN

In this work, Probabilistic Safety Assessment (PSA) is used to evaluate Allowed Outage Times (AOT) and Surveillance Test Intervals (STI) extensions for three Angra 1 nuclear power plant safety systems.

The interest in such an analysis lies on the fact that PSA comprises a risk-based tool for safety evaluation and has been increasingly applied to support both the regulatory and the operational decision-making processes.

Regarding Angra 1, among other applications, PSA is meant to be an additional method that can be used by the utility to justify Technical Specification relaxation to the Brazilian regulatory body.

The risk measure used in this work is the Core Damage Frequency, obtained from the Angra 1 Level 1 PSA study.

AOT and STI extensions are evaluated for the Safety Injection, Service Water and Auxiliary Feedwater Systems using the SAPHIRE code.

In order to compensate for the risk increase caused by the extensions, compensatory measures as (1) test of redundant train prior to entering maintenance and (2) staggered test strategy are proposed.

Results have shown that the proposed AOT extensions are acceptable for two of the systems with the implementation of compensatory measures whereas STI extensions are acceptable for all three systems.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Orlando Gibelli, Sonia M.& e Melo, P. F. Frutuoso& Bogado Leite, Sérgio Q.. 2012. Risk-Based Allowed Outage Time and Surveillance Test Interval Extensions for Angra 1. International Journal of Quality, Statistics, and Reliability،Vol. 2012, no. 2012, pp.1-13.
https://search.emarefa.net/detail/BIM-452021

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Orlando Gibelli, Sonia M.…[et al.]. Risk-Based Allowed Outage Time and Surveillance Test Interval Extensions for Angra 1. International Journal of Quality, Statistics, and Reliability No. 2012 (2012), pp.1-13.
https://search.emarefa.net/detail/BIM-452021

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Orlando Gibelli, Sonia M.& e Melo, P. F. Frutuoso& Bogado Leite, Sérgio Q.. Risk-Based Allowed Outage Time and Surveillance Test Interval Extensions for Angra 1. International Journal of Quality, Statistics, and Reliability. 2012. Vol. 2012, no. 2012, pp.1-13.
https://search.emarefa.net/detail/BIM-452021

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-452021