Reinforcement Learning Ramp Metering without Complete Information

المؤلفون المشاركون

Xi, Xiao-Ming
Wang, Xing-Ju
Gao, Gui-Feng

المصدر

Journal of Control Science and Engineering

العدد

المجلد 2012، العدد 2012 (31 ديسمبر/كانون الأول 2012)، ص ص. 1-8، 8ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2012-03-05

دولة النشر

مصر

عدد الصفحات

8

التخصصات الرئيسية

هندسة كهربائية
تكنولوجيا المعلومات وعلم الحاسوب

الملخص EN

This paper develops a model of reinforcement learning ramp metering (RLRM) without complete information, which is applied to alleviate traffic congestions on ramps.

RLRM consists of prediction tools depending on traffic flow simulation and optimal choice model based on reinforcement learning theories.

Moreover, it is also a dynamic process with abilities of automaticity, memory and performance feedback.

Numerical cases are given in this study to demonstrate RLRM such as calculating outflow rate, density, average speed, and travel time compared to no control and fixed-time control.

Results indicate that the greater is the inflow, the more is the effect.

In addition, the stability of RLRM is better than fixed-time control.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Wang, Xing-Ju& Xi, Xiao-Ming& Gao, Gui-Feng. 2012. Reinforcement Learning Ramp Metering without Complete Information. Journal of Control Science and Engineering،Vol. 2012, no. 2012, pp.1-8.
https://search.emarefa.net/detail/BIM-454651

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Wang, Xing-Ju…[et al.]. Reinforcement Learning Ramp Metering without Complete Information. Journal of Control Science and Engineering No. 2012 (2012), pp.1-8.
https://search.emarefa.net/detail/BIM-454651

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Wang, Xing-Ju& Xi, Xiao-Ming& Gao, Gui-Feng. Reinforcement Learning Ramp Metering without Complete Information. Journal of Control Science and Engineering. 2012. Vol. 2012, no. 2012, pp.1-8.
https://search.emarefa.net/detail/BIM-454651

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-454651