Similitude Conditions Modeling Geosynthetic-Reinforced Piled Embankments Using FEM and FDM Techniques

المؤلفون المشاركون

Jennings, Keith
Naughton, Patrick J.

المصدر

ISRN Civil Engineering

العدد

المجلد 2012، العدد 2012 (31 ديسمبر/كانون الأول 2012)، ص ص. 1-16، 16ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2012-05-08

دولة النشر

مصر

عدد الصفحات

16

التخصصات الرئيسية

هندسة مدنية

الملخص EN

The numerical modelling of geosynthetic-reinforced piled embankments using both the finite element method (FEM) and finite difference method (FDM) are compared.

Plaxis 2D (FEM) was utilized to replicate FLAC (FDM) analysis originally presented by Han and Gabr on a unit cell axisymmetric model within a geosynthetic reinforced piled embankment (GRPE).

The FEM and FED techniques were found to be in reasonable agreement, in both characteristic trend and absolute value.

FEM consistently replicated the FDM outputs for deformational, loading, and load transfer mechanism (soil arching) response within the reinforced piled embankment structure with a reasonable degree of accuracy.

However the FDM approach was found to give a slightly higher reinforcement tension and stress concentration but lower reinforcement strain at the pile cap than FEM, which was attributed to the greater discretize of the model geometry in the FDM than in FEM.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Jennings, Keith& Naughton, Patrick J.. 2012. Similitude Conditions Modeling Geosynthetic-Reinforced Piled Embankments Using FEM and FDM Techniques. ISRN Civil Engineering،Vol. 2012, no. 2012, pp.1-16.
https://search.emarefa.net/detail/BIM-457528

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Jennings, Keith& Naughton, Patrick J.. Similitude Conditions Modeling Geosynthetic-Reinforced Piled Embankments Using FEM and FDM Techniques. ISRN Civil Engineering No. 2012 (2012), pp.1-16.
https://search.emarefa.net/detail/BIM-457528

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Jennings, Keith& Naughton, Patrick J.. Similitude Conditions Modeling Geosynthetic-Reinforced Piled Embankments Using FEM and FDM Techniques. ISRN Civil Engineering. 2012. Vol. 2012, no. 2012, pp.1-16.
https://search.emarefa.net/detail/BIM-457528

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-457528