Experimental Evaluation of FSM-Based Testing Cost for Time-Delay Systems

المؤلفون المشاركون

Xiaoxue, Wu
Desheng, Hu
Lu, Cai
Wei, Zheng

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-13، 13ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-07-21

دولة النشر

مصر

عدد الصفحات

13

التخصصات الرئيسية

هندسة مدنية

الملخص EN

With time-delay systems arising, time-delay system testing has attracted much attention.

Additionally, evaluating the cost and effectiveness is required to make a good test strategy in practice.

In this paper, we take time-delay and other five factors (state number, input number, output number, completeness degree, and accessibility degree) into account and present a timer embedded FSM (TEFSM) model to design a comparative strategy for assessing the coverage criteria and test suites generation methods for time-delay systems.

We explore the impact on the average length of test suites, in which the test suites generation methods, coverage criteria, and TEFSM model parameters are involved.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Wei, Zheng& Xiaoxue, Wu& Lu, Cai& Desheng, Hu. 2014. Experimental Evaluation of FSM-Based Testing Cost for Time-Delay Systems. Mathematical Problems in Engineering،Vol. 2014, no. 2014, pp.1-13.
https://search.emarefa.net/detail/BIM-465221

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Wei, Zheng…[et al.]. Experimental Evaluation of FSM-Based Testing Cost for Time-Delay Systems. Mathematical Problems in Engineering No. 2014 (2014), pp.1-13.
https://search.emarefa.net/detail/BIM-465221

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Wei, Zheng& Xiaoxue, Wu& Lu, Cai& Desheng, Hu. Experimental Evaluation of FSM-Based Testing Cost for Time-Delay Systems. Mathematical Problems in Engineering. 2014. Vol. 2014, no. 2014, pp.1-13.
https://search.emarefa.net/detail/BIM-465221

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-465221