Imperfect Reworking Process Consideration in Integrated Inventory Model under Permissible Delay in Payments

المؤلفون المشاركون

Lo, Ming-Cheng
Yang, Ming-Feng

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2008، العدد 2008 (31 ديسمبر/كانون الأول 2008)، ص ص. 1-18، 18ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2008-06-18

دولة النشر

مصر

عدد الصفحات

18

التخصصات الرئيسية

هندسة مدنية

الملخص EN

This study develops an improved inventory model to help the enterprises to advance their profit increasing and cost reduction in a single vendor single-buyer environment with general demand curve, adjustable production rate, and imperfect reworking process under permissible delay in payments.

For advancing practical use in a real world, we are concerned with the following strategy determining, which includes the buyer's optimal selling price, order quantity, and the number of shipments per production run from the vendor to the buyer.

An algorithm and numerical analysis are used to illustrate the solution procedure.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Lo, Ming-Cheng& Yang, Ming-Feng. 2008. Imperfect Reworking Process Consideration in Integrated Inventory Model under Permissible Delay in Payments. Mathematical Problems in Engineering،Vol. 2008, no. 2008, pp.1-18.
https://search.emarefa.net/detail/BIM-468004

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Lo, Ming-Cheng& Yang, Ming-Feng. Imperfect Reworking Process Consideration in Integrated Inventory Model under Permissible Delay in Payments. Mathematical Problems in Engineering No. 2008 (2008), pp.1-18.
https://search.emarefa.net/detail/BIM-468004

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Lo, Ming-Cheng& Yang, Ming-Feng. Imperfect Reworking Process Consideration in Integrated Inventory Model under Permissible Delay in Payments. Mathematical Problems in Engineering. 2008. Vol. 2008, no. 2008, pp.1-18.
https://search.emarefa.net/detail/BIM-468004

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-468004