Resource Constrained Project Scheduling Subject to Due Dates : Preemption Permitted with Penalty

المؤلف

Afshar-Nadjafi, Behrouz

المصدر

Advances in Operations Research

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-10، 10ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-04-16

دولة النشر

مصر

عدد الصفحات

10

التخصصات الرئيسية

تكنولوجيا المعلومات وعلم الحاسوب

الملخص EN

Extensive research works have been carried out in resource constrained project scheduling problem.

However, scarce researches have studied the problems in which a setup cost must be incurred if activities are preempted.

In this research, we investigate the resource constrained project scheduling problem to minimize the total project cost, considering earliness-tardiness and preemption penalties.

A mixed integer programming formulation is proposed for the problem.

The resulting problem is NP-hard.

So, we try to obtain a satisfying solution using simulated annealing (SA) algorithm.

The efficiency of the proposed algorithm is tested based on 150 randomly produced examples.

Statistical comparison in terms of the computational times and objective function indicates that the proposed algorithm is efficient and effective.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Afshar-Nadjafi, Behrouz. 2014. Resource Constrained Project Scheduling Subject to Due Dates : Preemption Permitted with Penalty. Advances in Operations Research،Vol. 2014, no. 2014, pp.1-10.
https://search.emarefa.net/detail/BIM-476992

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Afshar-Nadjafi, Behrouz. Resource Constrained Project Scheduling Subject to Due Dates : Preemption Permitted with Penalty. Advances in Operations Research No. 2014 (2014), pp.1-10.
https://search.emarefa.net/detail/BIM-476992

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Afshar-Nadjafi, Behrouz. Resource Constrained Project Scheduling Subject to Due Dates : Preemption Permitted with Penalty. Advances in Operations Research. 2014. Vol. 2014, no. 2014, pp.1-10.
https://search.emarefa.net/detail/BIM-476992

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-476992