Application of GO Management in Bistatic RCS Computation Using the Vector Parabolic Equation Method

المؤلفون المشاركون

Yu, W. M.
Zhang, J. F.
Cui, Tie Jun
Zhong, X. J.

المصدر

International Journal of Antennas and Propagation

العدد

المجلد 2013، العدد 2013 (31 ديسمبر/كانون الأول 2013)، ص ص. 1-4، 4ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2013-07-25

دولة النشر

مصر

عدد الصفحات

4

التخصصات الرئيسية

هندسة كهربائية

الملخص EN

The parabolic equation (PE) method is a good choice in solving large-scale problems, but the resultant matrix is usually ill conditioned.

In this letter, we introduce the geometric optics (GO) management in the calculation of bistatic radar cross sections using three-dimensional vector PE method.

This method manages the object surface by GO, and hence the ill-conditioned problem can be avoided.

Examples are given using the presented method, original method, and the method of moments.

Results show the validity and stability of the presented method.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Zhong, X. J.& Cui, Tie Jun& Zhang, J. F.& Yu, W. M.. 2013. Application of GO Management in Bistatic RCS Computation Using the Vector Parabolic Equation Method. International Journal of Antennas and Propagation،Vol. 2013, no. 2013, pp.1-4.
https://search.emarefa.net/detail/BIM-480826

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Zhong, X. J.…[et al.]. Application of GO Management in Bistatic RCS Computation Using the Vector Parabolic Equation Method. International Journal of Antennas and Propagation No. 2013 (2013), pp.1-4.
https://search.emarefa.net/detail/BIM-480826

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Zhong, X. J.& Cui, Tie Jun& Zhang, J. F.& Yu, W. M.. Application of GO Management in Bistatic RCS Computation Using the Vector Parabolic Equation Method. International Journal of Antennas and Propagation. 2013. Vol. 2013, no. 2013, pp.1-4.
https://search.emarefa.net/detail/BIM-480826

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-480826