Station Black-Out Analysis with MELCOR 1.8.6 Code for Atucha 2 Nuclear Power Plant

المؤلفون المشاركون

Bonelli, Analia
García, Juan Matias
Sonnenkalb, Martin
Caputo, Marcelo
Mazzantini, Oscar Alberto
Zanocco, Pablo
Gimenez, Marcelo

المصدر

Science and Technology of Nuclear Installations

العدد

المجلد 2012، العدد 2012 (31 ديسمبر/كانون الأول 2012)، ص ص. 1-17، 17ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2012-05-22

دولة النشر

مصر

عدد الصفحات

17

التخصصات الرئيسية

العلوم الهندسية و تكنولوجيا المعلومات

الملخص EN

A description of the results for a Station Black-Out analysis for Atucha 2 Nuclear Power Plant is presented here.

Calculations were performed with MELCOR 1.8.6 YV3165 Code.

Atucha 2 is a pressurized heavy water reactor, cooled and moderated with heavy water, by two separate systems, presently under final construction in Argentina.

The initiating event is loss of power, accompanied by the failure of four out of four diesel generators.

All remaining plant safety systems are supposed to be available.

It is assumed that during the Station Black-Out sequence the first pressurizer safety valve fails stuck open after 3 cycles of water release, respectively, 17 cycles in total.

During the transient, the water in the fuel channels evaporates first while the moderator tank is still partially full.

The moderator tank inventory acts as a temporary heat sink for the decay heat, which is evacuated through conduction and radiation heat transfer, delaying core degradation.

This feature, together with the large volume of the steel filler pieces in the lower plenum and a high primary system volume to thermal power ratio, derives in a very slow transient in which RPV failure time is four to five times larger than that of other German PWRs.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Bonelli, Analia& Mazzantini, Oscar Alberto& Sonnenkalb, Martin& Caputo, Marcelo& García, Juan Matias& Zanocco, Pablo…[et al.]. 2012. Station Black-Out Analysis with MELCOR 1.8.6 Code for Atucha 2 Nuclear Power Plant. Science and Technology of Nuclear Installations،Vol. 2012, no. 2012, pp.1-17.
https://search.emarefa.net/detail/BIM-485742

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Bonelli, Analia…[et al.]. Station Black-Out Analysis with MELCOR 1.8.6 Code for Atucha 2 Nuclear Power Plant. Science and Technology of Nuclear Installations No. 2012 (2012), pp.1-17.
https://search.emarefa.net/detail/BIM-485742

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Bonelli, Analia& Mazzantini, Oscar Alberto& Sonnenkalb, Martin& Caputo, Marcelo& García, Juan Matias& Zanocco, Pablo…[et al.]. Station Black-Out Analysis with MELCOR 1.8.6 Code for Atucha 2 Nuclear Power Plant. Science and Technology of Nuclear Installations. 2012. Vol. 2012, no. 2012, pp.1-17.
https://search.emarefa.net/detail/BIM-485742

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-485742