A Discrete Group Search Optimizer for Hybrid Flowshop Scheduling Problem with Random Breakdown

المؤلفون المشاركون

Gu, Xingsheng
Cui, Zhe

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-11، 11ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-02-27

دولة النشر

مصر

عدد الصفحات

11

التخصصات الرئيسية

هندسة مدنية

الملخص EN

The scheduling problems have been discussed in the literature extensively under the assumption that the machines are permanently available without any breakdown.

However, in the real manufacturing environments, the machines could be unavailable inevitably for many reasons.

In this paper, the authors introduce the hybrid flowshop scheduling problem with random breakdown (RBHFS) together with a discrete group search optimizer algorithm (DGSO).

In particular, two different working cases, preempt-resume case, and preempt-repeat case are considered under random breakdown.

The proposed DGSO algorithm adopts the vector representation and several discrete operators, such as insert, swap, differential evolution, destruction, and construction in the producers, scroungers, and rangers phases.

In addition, an orthogonal test is applied to configure the adjustable parameters in the DGSO algorithm.

The computational results in both cases indicate that the proposed algorithm significantly improves the performances compared with other high performing algorithms in the literature.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Cui, Zhe& Gu, Xingsheng. 2014. A Discrete Group Search Optimizer for Hybrid Flowshop Scheduling Problem with Random Breakdown. Mathematical Problems in Engineering،Vol. 2014, no. 2014, pp.1-11.
https://search.emarefa.net/detail/BIM-485849

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Cui, Zhe& Gu, Xingsheng. A Discrete Group Search Optimizer for Hybrid Flowshop Scheduling Problem with Random Breakdown. Mathematical Problems in Engineering No. 2014 (2014), pp.1-11.
https://search.emarefa.net/detail/BIM-485849

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Cui, Zhe& Gu, Xingsheng. A Discrete Group Search Optimizer for Hybrid Flowshop Scheduling Problem with Random Breakdown. Mathematical Problems in Engineering. 2014. Vol. 2014, no. 2014, pp.1-11.
https://search.emarefa.net/detail/BIM-485849

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-485849