A Novel Resource-Leveling Approach for Construction Project Based on Differential Evolution
المؤلفون المشاركون
المصدر
Journal of Construction Engineering
العدد
المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-7، 7ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2014-05-21
دولة النشر
مصر
عدد الصفحات
7
التخصصات الرئيسية
الملخص EN
In construction engineering, project schedules are commonly established by the critical path method.
Nevertheless, these schedules often lead to substantial fluctuations in the resource profile that are not only impractical but also costly for the contractors to execute.
Therefore, in order to smooth out the resource profile, construction managers need to perform resource-leveling procedures.
This paper proposes a novel approach for resource leveling, named as resource leveling based on differential evolution (RLDE).
The performance of the RLDE is compared to that of Microsoft Project software, the genetic algorithm, and the particle swarm optimization algorithm.
Experiments have proved that the newly developed method can deliver the most desirable resource-leveling result.
Thus, the RLDE is an effective method and it can be a useful tool for assisting managers/planners in the field of project management.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Tran, Hong-Hai& Hoang, Nhat-Duc. 2014. A Novel Resource-Leveling Approach for Construction Project Based on Differential Evolution. Journal of Construction Engineering،Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-488073
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Tran, Hong-Hai& Hoang, Nhat-Duc. A Novel Resource-Leveling Approach for Construction Project Based on Differential Evolution. Journal of Construction Engineering No. 2014 (2014), pp.1-7.
https://search.emarefa.net/detail/BIM-488073
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Tran, Hong-Hai& Hoang, Nhat-Duc. A Novel Resource-Leveling Approach for Construction Project Based on Differential Evolution. Journal of Construction Engineering. 2014. Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-488073
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-488073
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر