Three-Echelon Inventory Model with Permissible Delay in Payments under Controllable Lead Time and Backorder Consideration

المؤلفون المشاركون

Yang, M. F.
Tseng, Wei-Chung

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-16، 16ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-04-30

دولة النشر

مصر

عدد الصفحات

16

التخصصات الرئيسية

هندسة مدنية

الملخص EN

This paper proposes a three-echelon inventory model with permissible delay in payments under controllable lead time and backorder consideration to find out the suitable inventory policy to enhance profit of the supply chain.

In today’s highly competitive market, the supply chain management has become a critical issue in both practice and academic and supply chain members have to cooperate with each other to bring more benefits.

In addition, the inventory policy is a key factor to influence the performance of the supply chain.

Therefore, in this paper, we develop a three-echelon inventory model with permissible delay in payments under controllable lead time and backorder consideration.

Furthermore, the purpose of this paper is to maximize the joint expect total profit on inventory model and attempt to discuss the inventory policy under different conditions.

Finally, with a numerical example provided here to illustrate the solution procedure, we may discover that decision-makers can control lead time and payment time to enhance the performance of the supply chain.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Yang, M. F.& Tseng, Wei-Chung. 2014. Three-Echelon Inventory Model with Permissible Delay in Payments under Controllable Lead Time and Backorder Consideration. Mathematical Problems in Engineering،Vol. 2014, no. 2014, pp.1-16.
https://search.emarefa.net/detail/BIM-499792

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Yang, M. F.& Tseng, Wei-Chung. Three-Echelon Inventory Model with Permissible Delay in Payments under Controllable Lead Time and Backorder Consideration. Mathematical Problems in Engineering No. 2014 (2014), pp.1-16.
https://search.emarefa.net/detail/BIM-499792

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Yang, M. F.& Tseng, Wei-Chung. Three-Echelon Inventory Model with Permissible Delay in Payments under Controllable Lead Time and Backorder Consideration. Mathematical Problems in Engineering. 2014. Vol. 2014, no. 2014, pp.1-16.
https://search.emarefa.net/detail/BIM-499792

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-499792